Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
Particle Boards are a relatively new type of engineered wood product that are made from gluing together small chips and saw-dust and firmly pressing t...
|
Capacity : Particle Board (Wood Based) 56652 Sq Ft/Day |
Plant and Machinery cost: Rs 1521 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.11 |
|
Break Even Point (BEP): 54.19 |
TCI : Cost of Project : Rs 2501 Lakhs |
|
Cost of Project : 250100000 |
Ayurvedic medicine is a traditional type of medicine. It is now being recognized all over the world as one of the best type of medicine. It was ingred...
|
Capacity : Gastritis Sugar Coated Tablets :1000 Bottles/Day •Liver Tablets :1000 Bottles/Day •Panchsakara Churna:2000 Bottles/Day |
Plant and Machinery cost: Rs 91 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.83 |
|
Break Even Point (BEP): 44.75 |
TCI : Cost of Project :Rs 354 Lakhs |
|
Cost of Project : 35400000 |
PVC pipes are made out of a material known as polyvinyl chloride, a durable, strong plastic-like substance. Pipes are constructed from this material a...
|
Capacity : Rigid Polyvinyl Chloride (RPVC) Pipes : 4.8 MT/Day |
Plant and Machinery cost: Rs 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 66.90 |
TCI : Cost of Project : Rs 292 Lakhs |
|
Cost of Project : 29200000 |
The resin bond diamond wheels are mainly used for grinding tungsten carbide and non-metal materials. Various kinds of dimensions and shapes are availa...
|
Capacity : Resin Bonded Diamond Wheels:4000 Nos/Day |
Plant and Machinery cost: Rs 92 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.85 |
|
Break Even Point (BEP): 57.77 |
TCI : Cost of Project : Rs 871 Lakhs |
|
Cost of Project : 87100000 |
The pharmaceutical industry develops, produces, and markets drugs or pharmaceuticals licensed for use as medications. Pharmaceutical companies are all...
|
Capacity : - |
Plant and Machinery cost: Rs 840 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.84 |
|
Break Even Point (BEP): 29.39 |
TCI : Cost of Project :Rs 136219 Lakhs |
|
Cost of Project : 13621300000 |
We often define warehousing as the storage of goods. Broadly interpreted, this definition includes a wide spectrum of facilities and locations that pr...
|
Capacity : Sacks Storage:50,000 Sacks/Day |
Plant and Machinery cost: Rs 181 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.72 |
|
Break Even Point (BEP): 40.42 |
TCI : Cost of Project : Rs 771 Lakhs |
|
Cost of Project : 77100000 |
Fertilizers are chemical compounds applied to promote plant and fruit growth. Fertilizers are usually applied either through the soil (for uptake by p...
|
Capacity : Complex NPK Fertilizer 17:17:17 Grade: 600 MT/Day |
Plant and Machinery cost: Rs 2745 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 65.63 |
TCI : Cost of Project : Rs 6946 Lakhs |
|
Cost of Project : 694600000 |
Most foods contain very high percentage of water. Microorganisms thrive when there is water, spoiling the food and altering its taste. Removing water...
|
Capacity : Freeze Dried Vegetables 730 Kgs/Day |
Plant and Machinery cost: Rs 336 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.19 |
|
Break Even Point (BEP): 53.97 |
TCI : Cost of Project : Rs 572 Lakhs |
|
Cost of Project : 57200000 |
Due to rapid increase in the production and consumption processes, societies generate as well as reject solid materials regularly from various sectors...
|
Capacity : Organic Compost : 13.75 MT/Day •Refused Derived Fuel (RDF):3.75 MT/Day •Innerts:3.75 MT/Day •Recyclables :3.75 MT/Day |
Plant and Machinery cost: Rs 196 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.93 |
|
Break Even Point (BEP): 49.81 |
TCI : Cost of Project:Rs 822 Lakhs |
|
Cost of Project : 82200000 |
Naphthalene is the single most abundant component of coal tar. Although the composition of coal tar varies with the coal from which it is produced, ty...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Export means taking goods out of India to a place outside India.” Export trade in India is regulated by the Directorate General of Foreign Trade (DGFT...
|
Capacity : Fruits – Apple 800.0 Kgs/Day•Banana 600 Kgs/Day •Mango 600 Kgs/Day •Grapes 400 Kgs/Day •Pomogranates 400 Kgs/Day •Vegetables – Potato 600 Kgs/Day •Onion 400 Kgs/Day •Lentil 400 Kgs/Day •Grains – Rice 600 Kgs/Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 31.98 |
|
Break Even Point (BEP): 59.05 |
TCI : Cost of Project: Rs 697 Lakhs |
|
Cost of Project : 69700000 |
Curry powder is a blend of many spices, and comes in almost infinite varieties. Each curry powder can have different component spices, in differing am...
|
Capacity : Curry Powder:400 Kgs/Day •Garam Masala:400 Kgs/Day •Sambhar Masala :400 Kgs/Day •Biryani Masala:400 Kgs/Day •Chicken Fry Masala :400 Kgs/Day |
Plant and Machinery cost: Rs 64 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.29 |
|
Break Even Point (BEP): 52.53 |
TCI : Cost of Project: Rs 326 Lakhs |
|
Cost of Project : 32600000 |