Best Business Opportunities in Syria, Middle East - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Please choose a project below related to this category.

Ductile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & Sewage

Ductile Iron Pipe Fittings Production for Water & Sewage. DI Pipes Fittings Manufacturing Business Opportunity Ductile Iron Pipe Fittings Ductile ir...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Rim
Bicycle Rim

A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, especially in the context of ready...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mobile phones, power tools, teleco...

Capacity :

90 Volt, 180 AH Lithium Ion Battery Pack: 56 Nos/day

Plant and Machinery cost:

Rs 90 lakhs

Working Capital :

-

Rate of Return (ROR):

34.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 1076 lakhs

Cost of Project :

107600000

Phosphoric Acid from Rock Phosphate  (By Using 25% Venyl Sulphon Content Sulphuric Acid and Hydrochloric Acid)
Phosphoric Acid from Rock Phosphate (By Using 25% Venyl Sulphon Content Sulphuric Acid and Hydrochloric Acid)

Phosphoric acid (also known as orthophosphoric acid or phosphoric (V) acid) is a weak acid with the chemical formula H3PO4. Orthophosphoric acid refer...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Naphthalene from Coal Tar & Petroleum Waste
Naphthalene from Coal Tar & Petroleum Waste

Naphthalene is an organic compound with formula C10H8. It is the simplest polycyclic aromatic hydrocarbon, and is a white crystalline solid with a cha...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Cast Iron & S.G. Iron Castings
Cast Iron & S.G. Iron Castings

Cast iron is a group of iron-carbon alloys with a carbon content greater than 2%. Its usefulness derives from its relatively low melting temperature....

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matches Production Matchsticks are a very handy tool used in starting...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Gypsum Mining for Production of Plaster of Paris Powder
Gypsum Mining for Production of Plaster of Paris Powder

Gypsum is a soft sulfate mineral composed of calcium sulfate dihydrate, with the chemical formula CaSO4•2H2O. It is widely mined and is used as a fert...

Capacity :

Gypsum Powder: 4800 MT/Day Plaster of Paris Powder: 7200 MT/Day

Plant and Machinery cost:

Rs. 3387 Crores

Working Capital :

-

Rate of Return (ROR):

16.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project: Rs.3948 Crores

Cost of Project :

39480000000

Low Carbon Ferromanganese Production
Low Carbon Ferromanganese Production

Low Carbon Ferromanganese Production. Manufacturing Project of Low Carbon Ferromanganese. Production of Ferroalloys Low Carbon Ferro Manganese is wid...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...

Capacity :

Gypsum Plaster Board: 13333 Sq.mt./Day

Plant and Machinery cost:

Rs. 476 lakhs

Working Capital :

-

Rate of Return (ROR):

34.00

Break Even Point (BEP):

33.00

TCI :

Cost of Project: Rs 3394 lakhs

Cost of Project :

339400000

Low Carbon Ferromanganese
Low Carbon Ferromanganese

Ferro Manganse in different gradesa is used in manufacturing of Welding Electrodes & also special types of stick electrodes. Low Carbon Ferro Mangane...

Capacity :

Low Carbon Ferromanganese: 50 MT/Day

Plant and Machinery cost:

Rs. 904 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

58.00

TCI :

Cost of Project: Rs. 3615lakhs

Cost of Project :

361500000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp