Please choose a project below related to this category.
[NPCS/5677/24527] The global chemical industry is changing quickly, and acetic anhydride is one of the most commercially lucrative and steadily mar...
|
Capacity : Acetic Anhydride: 65 MT Per Day Acetic Acid (By Product): 7 MT Per Day |
Plant and Machinery cost: 16200 |
|
Working Capital : N/A |
Rate of Return (ROR):
|
|
Break Even Point (BEP):
|
TCI :
|
|
Cost of Project : 20100 |
Moringa Oleifera Powder, a superfood made from dried leaves of the drumstick tree, is a natural supplement with a wide range of uses in the food, cosm...
|
Capacity : 1,000 Kgs Per Day |
Plant and Machinery cost: 91 |
|
Working Capital : N/A |
Rate of Return (ROR): 52 |
|
Break Even Point (BEP): 28 |
TCI :
|
|
Cost of Project : 261 |
For new entrants to the bulk chemical industry, starting the production of Caustic Soda Flakes will offer a unique opportunity to establish a business...
|
Capacity : Caustic Soda Flakes (98%): 8,000 Kgs Per Day by Product Chorine Gas: 6,948 Kgs Per Day by Product Hydrogen Gas: 197 Kgs Per Day |
Plant and Machinery cost: 655 |
|
Working Capital : N/A |
Rate of Return (ROR): 27 |
|
Break Even Point (BEP): 47 |
TCI :
|
|
Cost of Project : 1224 |
Industrial-grade metal applications have grown immensely to develop the power transfer systems, electric vehicle production, renewable energy systems,...
|
Capacity : Copper Cathode: 2100 MT Per Annum Copper Slag, Residue: 135 MT Per Annum |
Plant and Machinery cost: 649 |
|
Working Capital : N/A |
Rate of Return (ROR): 29 |
|
Break Even Point (BEP): 57 |
TCI :
|
|
Cost of Project : 1536 |
The rapid changes in the renewable energy sector present many opportunities for starting new businesses in the manufacturing of Monocrystalline Solar...
|
Capacity : 4 Mw Per Day |
Plant and Machinery cost: 13570 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 47 |
TCI :
|
|
Cost of Project : 20737 |
The fiberglass composite see-through LPG cylinders are set to revolutionize the LPG industry. They also provide the invaluable benefit of safety by al...
|
Capacity : 2,000 Nos. Per Day |
Plant and Machinery cost: 10100 |
|
Working Capital : N/A |
Rate of Return (ROR): 25 |
|
Break Even Point (BEP): 40 |
TCI :
|
|
Cost of Project : 13600 |
The rise in demand for lithium-ion batteries has created a new set of challenges in battery recycling for electric vehicles, smartphones, and solar en...
|
Capacity : Black Mass: 4,200 MT Per Annum Lithium: 3 MT Per Annum Cobalt: 9 MT Per Annum Nickel: 12 MT Per Annum |
Plant and Machinery cost: 434 |
|
Working Capital : N/A |
Rate of Return (ROR): 31 |
|
Break Even Point (BEP): 55 |
TCI :
|
|
Cost of Project : 1150 |
The healthcare sector in India is undergoing a revolutionary shift. With rising incomes, increased health awareness, and supportive government policie...
|
Capacity : 275 Beds |
Plant and Machinery cost: 9700 |
|
Working Capital : N/A |
Rate of Return (ROR): 20 |
|
Break Even Point (BEP): 43 |
TCI :
|
|
Cost of Project : 27200 |
In the ever-evolving landscape of the electrical and power generation sector, power transformers remain a critical component for effective energy tran...
|
Capacity : Power Transformers (132/33KV, 10000KVA Core Type Oil Cooled): 120 Nos Per Annum |
Plant and Machinery cost: 111 |
|
Working Capital : N/A |
Rate of Return (ROR): 33 |
|
Break Even Point (BEP): 73 |
TCI :
|
|
Cost of Project : 289 |
Curcumin, the bioactive compound found in turmeric, has emerged as a high-demand ingredient across industries such as pharmaceuticals, nutraceuticals,...
|
Capacity : Curcumin Powder: 25 Kgs Per Day Turmeric Oil: 25 Kgs Per Day Deoiled Turmeric: 463 Kgs Per Day |
Plant and Machinery cost: 120 |
|
Working Capital : N/A |
Rate of Return (ROR): 30 |
|
Break Even Point (BEP): 63 |
TCI :
|
|
Cost of Project : 240 |
Chemically, sodium chlorite has the formula NaClO2. It is a white, crystalline material that is non-flammable and odourless. It is employed in industr...
|
Capacity : Sodium Chlorite (NaClO2: 15 MT Per Day |
Plant and Machinery cost: 567 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: 1892 Lakhs |
|
Cost of Project : 189200000 |
A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs are distinguished by much larger b...
|
Capacity : 50 Nos./day |
Plant and Machinery cost: 95 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 279 lakhs |
|
Cost of Project : 27900000 |