E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
Surgical cotton is also known as absorbent cotton or cotton wool. It is mainly used for medical purposes in hospitals, nursing homes, and dispensarie...
|
Capacity : 500 Kgs./Day |
Plant and Machinery cost: 61 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 156 Lakhs |
|
Cost of Project : 15600000 |
A beverage can is a metal container designed to hold a fixed portion of liquid such as a carbonated soft drink, alcoholic beverage, fruit juice, herba...
|
Capacity : 1000 Kg /day |
Plant and Machinery cost: 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 298 Lakhs |
|
Cost of Project : 29800000 |
Water seepage is a major problem in construction industries particularly when the buildings are constructed in the damped environment. A large number...
|
Capacity : 3000 Liters /day |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 419 Lakhs |
|
Cost of Project : 0 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 777 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 1253 Lakhs |
|
Cost of Project : 125300000 |
Cotton is fun and fashionable. Its beauty and natural comfort make the world a better place. Can you imagine a world without cotton? It's often the fi...
|
Capacity : 4 MT/Day |
Plant and Machinery cost: 56 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 280 Lakhs |
|
Cost of Project : 0 |
Packaging is both a symbol of societys consumption habits and reflection of its progress. The user expects it to have better strength, easier handling...
|
Capacity : 36000000 Nos./ Annum |
Plant and Machinery cost: 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 835 Lakhs |
|
Cost of Project : 83500000 |
Marble is a non-foliated metamorphic rock composed of recrystallized carbonate minerals, most commonly calcite or dolomite. Geologists use the term ma...
|
Capacity : -- |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : - |
|
Cost of Project : 0 |