Please choose a project below related to this category.
The hypodermic syringe, also known as the hypodermic needle, is a device used by medical professionals to transfer liquids into or out of the body.A s...
|
Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 82000 Th.Nos./annum |
Plant and Machinery cost: Rs. 2410 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 17.00 |
TCI : Cost of Project: Rs14240 lakhs |
|
Cost of Project : 1424000000 |
Cassava Starch Manufacturing Industry. Tapioca Starch Processing and Production Business. Start a Starch Manufacturing Business Cassava starch is pro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Fructose Syrup Production from Broken Rice. High Fructose Rice Syrup (HFS 90%) Manufacturing Business This is a natural sweetener produced by adding...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
See more https://goo.gl/AFp4nz https://goo.gl/gNTvzL Contact us: Niir Project Consultancy Services An ISO 9001:2015 Company 106-E, Kamla N...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Waterproofing is nothing but preventing the passage of both air and water through a fabric.” For certain uses such as Tarpaulin, Umbrella cloth, Rain...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Canned fish are fish which have been processed, sealed in an airtight container such as a sealed tin can, and subjected to heat. Canning is a method o...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Litchi Beverage Production. Lychee Fruit Juice. Litchi Drink Manufacturing Industry Lychee/Litchi is a tropical fruit native to low elevation lands o...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Dried Malted Beverage Food Malt is made from malting grade cereals, usually barley or wheat, although occasionally other cereals such as rye may be u...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, especially in the context of ready...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Biomedical Waste Recycling Industry. Start a Medical or Hospital Waste Management Business Biomedical waste (BMW) is any waste produced during the di...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mobile phones, power tools, teleco...
|
Capacity : 90 Volt, 180 AH Lithium Ion Battery Pack: 56 Nos/day |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 1076 lakhs |
|
Cost of Project : 107600000 |