Best Business Opportunities in Tunisia, Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Detergent Cake and Detergent Powder Manufacturing Industry
Detergent Cake and Detergent Powder Manufacturing Industry

Detergent Cake and Detergent Powder Manufacturing Industry. Start a Washing Powder and Cake Business Detergent is a blend of surfactants with cleanin...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Galvanising of Zinc (By Electrical Process)
Galvanising of Zinc (By Electrical Process)

The Zinc Galvanizing process starts by carefully cleaning the surface of the steel by hoisting it from the Black area by a 2MT EOT crane and immersing...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Hybrid Electric Scooter Assembling Business
Hybrid Electric Scooter Assembling Business

Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Business Opportunities in Electric Two-Wheelers Manufacturing Industry...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Zinc Sulphate
Zinc Sulphate

Zinc sulphate is a very water soluble, transparent, colorless, crystalline compound. It is commonly used as the heptahydrate, ZnSO4 •7H2O, and is comm...

Capacity :

Zinc Sulphate 33%: 2 MT/day Zinc Sulphate 21%: 3 MT/day Zinc Sulphate 12% Soln. : 5 MT/day

Plant and Machinery cost:

Rs 146 lakhs

Working Capital :

-

Rate of Return (ROR):

32.00

Break Even Point (BEP):

62.00

TCI :

Cost of Project: Rs 237 lakhs

Cost of Project :

23700000

Zinc Chloride
Zinc Chloride

Zinc Chloride (ZnCl2) is available as white, crystalline powder, odourless, moulded in pencils or porcelains like mass.Zinc chloride is the name of ch...

Capacity :

Zinc Chloride from Zinc Ash: 9MT/day Zinc Chloride from Zinc Oxide: 1 MT/day

Plant and Machinery cost:

Rs. 146 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

65.00

TCI :

Cost of Project: Rs. 246 lakhs

Cost of Project :

24600000

Recovery of Lead from Scrap Batteries
Recovery of Lead from Scrap Batteries

The recovery of metals from metal scrap has the advantage that it is easier and far less energy dependent than the production of primary lead from ore...

Capacity :

Lead Ingot: 8 MT/day

Plant and Machinery cost:

Rs 96 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

54.00

TCI :

Cost of Project: Rs 370 lakhs

Cost of Project :

37000000

Zinc Chloride
Zinc Chloride

Zinc chloride is the name of chemical compounds with the formula ZnCl2 and its hydrates. Zinc chlorides, of which nine crystalline forms are known, ar...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Rim
Bicycle Rim

A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, especially in the context of ready...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mobile phones, power tools, teleco...

Capacity :

90 Volt, 180 AH Lithium Ion Battery Pack: 56 Nos/day

Plant and Machinery cost:

Rs 90 lakhs

Working Capital :

-

Rate of Return (ROR):

34.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 1076 lakhs

Cost of Project :

107600000

Phosphoric Acid from Rock Phosphate  (By Using 25% Venyl Sulphon Content Sulphuric Acid and Hydrochloric Acid)
Phosphoric Acid from Rock Phosphate (By Using 25% Venyl Sulphon Content Sulphuric Acid and Hydrochloric Acid)

Phosphoric acid (also known as orthophosphoric acid or phosphoric (V) acid) is a weak acid with the chemical formula H3PO4. Orthophosphoric acid refer...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Naphthalene from Coal Tar & Petroleum Waste
Naphthalene from Coal Tar & Petroleum Waste

Naphthalene is an organic compound with formula C10H8. It is the simplest polycyclic aromatic hydrocarbon, and is a white crystalline solid with a cha...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp