Please choose a project below related to this category.
Cycling is amongst the most sustainable modes of mobility, which has zero dependence on fossil fuels and zero emissions unlike the motorized modes of...
|
Capacity : Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum |
Plant and Machinery cost: 405 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 646 lakhs |
|
Cost of Project : 64600000 |
Solar Panels are in general Silicon made Rectangular Shaped Glass Covered Products which Produce Electricity when exposed to the Sun. These Panels pro...
|
Capacity : Solar PV Module (240 watt) : 350 Nos/day (25 MW) |
Plant and Machinery cost: Rs 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of project: Rs 852 Lakhs |
|
Cost of Project : 85200000 |
Hematite is one of the most abundant minerals on Earth's surface and in the shallow crust. It is an iron oxide with a chemical composition of Fe2O3. I...
|
Capacity : Hematite:120 MT/Day |
Plant and Machinery cost: Rs 416 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.11 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 1081 Lakhs |
|
Cost of Project : 108100000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/Day •Micronutrients Fertilizer for Citrus: 500 Kgs/Day |
Plant and Machinery cost: Rs 7 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project:Rs 30 Lakhs |
|
Cost of Project : 3000000 |
A pencil is lead material enclosed in wood or put in metal holder used for drawing or writing. Pencil is a valuable item used by all levels of schools...
|
Capacity : Wooden Pencils 200 Gross/Day |
Plant and Machinery cost: Rs 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.60 |
|
Break Even Point (BEP): 71.87 |
TCI : Cost of Project : Rs 55 Lakhs |
|
Cost of Project : 5500000 |
Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from lim...
|
Capacity : Plastic Granules 4500 Kgs/Day |
Plant and Machinery cost: Rs 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 64.52 |
TCI : Cost of Project : Rs 219 Lakhs |
|
Cost of Project : 21900000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...
|
Capacity : Bicycles (Different Sizes):2000 Nos./Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.39 |
|
Break Even Point (BEP): 31.24 |
TCI : Cost of Project:Rs 3972 Lakhs |
|
Cost of Project : 397200000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of choic...
|
Capacity : Copper Powder:3.33 MT/Day |
Plant and Machinery cost: Rs 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.33 |
|
Break Even Point (BEP): 63.22 |
TCI : Cost of Project:Rs 321 Lakhs |
|
Cost of Project : 32100000 |
It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...
|
Capacity : Packaged Drinking Water (1 Ltr. Size):120000 |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 268 Lakhs |
|
Cost of Project : 26800000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...
|
Capacity : •Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 56.37 |
TCI : Cost of Project: Rs 314 Lakhs |
|
Cost of Project : 31400000 |