Please choose a project below related to this category.
The rise in demand for lithium-ion batteries has created a new set of challenges in battery recycling for electric vehicles, smartphones, and solar en...
|
Capacity : Black Mass: 4,200 MT Per Annum Lithium: 3 MT Per Annum Cobalt: 9 MT Per Annum Nickel: 12 MT Per Annum |
Plant and Machinery cost: 434 |
|
Working Capital : N/A |
Rate of Return (ROR): 31 |
|
Break Even Point (BEP): 55 |
TCI :
|
|
Cost of Project : 1150 |
Solar power is one of the most promising renewables. It is reliable and less vulnerable to changes in seasonal weather patterns. Hydrogen, in the capa...
|
Capacity : Solar Power: 1 MW |
Plant and Machinery cost: Rs. 411 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs.811 lakhs |
|
Cost of Project : 81100000 |
Tissue paper or simply tissue is a light weight paper or, light crêpe paper. Tissue can be made from recycled paper pulp. Tissue is a category compris...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 986.13 Lakhs |
|
Cost of Project : 98600000 |
Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...
|
Capacity : 200000 MT /Annum |
Plant and Machinery cost: 431 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 3700 lakhs |
|
Cost of Project : 3700000 |
Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...
|
Capacity : 200000 MT /Annum |
Plant and Machinery cost: 431 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 3700 lakhs |
|
Cost of Project : 3700000 |
An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...
|
Capacity : Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum |
Plant and Machinery cost: Rs 442 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 6777 lakhs |
|
Cost of Project : 677700000 |
Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF3 is refractory, in strong contrast to...
|
Capacity : Aluminium Fluoride : 16.7 MT/Day •Silica as by product: 5.67 MT/Day |
Plant and Machinery cost: Rs 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.69 |
|
Break Even Point (BEP): 56.04 |
TCI : Cost of Project : Rs 1069 Lakhs |
|
Cost of Project : 106900000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Steel is one such material that has played an important role in the development of mankind in the last century. Today, it is difficult to imagine a wo...
|
Capacity : 36000 MT/Annum |
Plant and Machinery cost: 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 1543 Lakhs |
|
Cost of Project : 0 |