Please choose a project below related to this category.
Chili oil is essentially dried chilies, preserved in oil. It adds a delightful kick to whatever dish you’re using it in. Commonly used as a finishing...
|
Capacity : Chilli Oil: 27,300 Kg./Annum Oleoresin: 122,700 Kg./Annum |
Plant and Machinery cost: Rs 1828 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs2450 lakhs |
|
Cost of Project : 245000000 |
Linear Alkyl Benzene Sulphonic Acid is a largest volume synthetic surfactant because of its relatively low cost, good performance, the fact that it ca...
|
Capacity : Linear Alkyl Benzene Sulphonic Acid: 600 MT/Day |
Plant and Machinery cost: Rs 1930 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs4584lakhs |
|
Cost of Project : 458400000 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 50000 Sq.mt./Day |
Plant and Machinery cost: Rs 1605 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project : Rs12502 lakhs |
|
Cost of Project : 1250200000 |
Sulfuric acid or sulphuric acid) is a mineral acid with molecular formula H2SO4. It is a colorless, odorless, and syrupy liquid that is soluble in wat...
|
Capacity : Sulphuric Acid 98%: 150 MT/Day Oleum 65%: 50MT/Day Oleum 23%: 60 MT/Day Chlorosulphonic Acid: 48 MT/Day Steam : 100 MT/Day |
Plant and Machinery cost: Rs 1482 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 27.00 |
TCI : Cost of Project : Rs 2357 lakhs |
|
Cost of Project : 235700000 |
Coal Washing Unit is one of the most important units for up-gradation of Coal in sense of fed value by reducing of ash content in the Coal. It is basi...
|
Capacity : Coal Washing (Job Work) : 3000MT/Day |
Plant and Machinery cost: Rs 668 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs1735lakhs |
|
Cost of Project : 1735100000 |
Palm oil is edible oil which is extracted from the pulp of fruit of oil palms. The color of pulp is red. That's why crude palm oil is naturally simila...
|
Capacity : Edible Oil Refinery from Crude Palm Oil : 80 MT/Day |
Plant and Machinery cost: Rs 1087 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs5329lakhs |
|
Cost of Project : 532900000 |
Brown rice (malt) syrup, also known as rice syrup or rice malt, is a sweetener which is rich in compounds categorized as sugars and is derived by cult...
|
Capacity : 80 MT/Day |
Plant and Machinery cost: 1129 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 2894 lakhs |
|
Cost of Project : 289400000 |
Mango Pulp is prepared from selected varieties of Fresh Mango Fruit. Fully matured Mangoes are harvested, quickly transported to the fruit processing...
|
Capacity : Mango Pulp: 32.50 MT/Day Mango Concentrate: 16.25 MT/Day |
Plant and Machinery cost: 1885 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 3232 lakhs |
|
Cost of Project : 323200000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. Most materials in the diaper are held together w...
|
Capacity : Sanitary Napkins (8 Pcs/Pkt) : 31250 Packets/Day Baby Diapers (4 Pcs/Pkt): 25000 Packets/Day |
Plant and Machinery cost: 704 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1331 lakhs |
|
Cost of Project : 133100000 |
Potato powder is increasingly being used in a variety of food preparations like snack foods, soups, curries and other dishes as a thickening agent. Po...
|
Capacity : Potato Powder: 5 MT/Day Potato Granules : 2.50 MT/Day Potato Pellets: 2.50 MT/Day |
Plant and Machinery cost: 726 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs 1068 lakhs |
|
Cost of Project : 106800000 |
A razor is a bladed tool primarily used in the removal of unwanted body hair through the act of shaving. Kinds of razors include straight razors, disp...
|
Capacity : Razor Blade (Double Edge): 100,000 PKTS/Day |
Plant and Machinery cost: Rs 681 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 1325 lakhs |
|
Cost of Project : 132500000 |
“The nation's competitiveness depends, in part, on the skills of tomorrow's engineers.” As the saying goes, there is need of engineering college...
|
Capacity : Engineering College: 40 Students each Branch, 6 Branches.Total Students in 4th Year 960 Nos. |
Plant and Machinery cost: Rs 571 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 3065 lakhs |
|
Cost of Project : 306500000 |