Please choose a project below related to this category.
Pectin is a structural heteropolysaccharide contained in the primary cell walls of terrestrial plants. It was first isolated and described in 1825 by...
|
Capacity : 150,000Kgs/annum |
Plant and Machinery cost: 1289 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project 1660 Lakhs |
|
Cost of Project : 166000000 |
A hospitality unit such as a restaurant, hotel, or an amusement park consists of multiple groups such as facility maintenance and direct operations (s...
|
Capacity : 150 Nos of Room |
Plant and Machinery cost: 1940 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : Rs 4925 lakhs |
|
Cost of Project : 492500000 |
A diaper (American English) or a nappy (British English) is a type of underwear that allows the wearer to defecate or urinate without the use of a toi...
|
Capacity : Baby Diapers : 3000000 Pkts/annum Adult Diapers : 1500000 Pkts/annum Sanitary Napkins : 4500000 Pkts/annum |
Plant and Machinery cost: 1029 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 1657 lakhs |
|
Cost of Project : 165700000 |
Aluminium fluoride (AlF3) is an inorganic compound used primarily in the production of aluminium. This colorless solid can be prepared synthetically b...
|
Capacity : Aluminium Fluoride: 60,000MT/annum Silica as bye product: 20,400MT/annum |
Plant and Machinery cost: 1739 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 3496 lakhs |
|
Cost of Project : 349600000 |
Fusion bonded epoxies are one part, heat curable, thermosetting epoxy utilized for corrosion protection. FBEs are applied to heated parts in a powder...
|
Capacity : Fusion Bonded Epoxy Coating of TMT Bars: 72,000 MT/annum |
Plant and Machinery cost: Rs 768 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 2932 lakhs |
|
Cost of Project : 293200000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner.Diapers are primarily worn by children who are no...
|
Capacity : Sanitary Napkins (8 Pcs/Pkt) : 4,500,000 packets/annum Baby Diapers (4 Pcs/Pkt) : 6,000,000 packets/annum |
Plant and Machinery cost: Rs 658 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs 1184 lakhs |
|
Cost of Project : 118400000 |
Fiberboard is a type of engineered wood product that is made out of wood fibers. Types of fiberboard (in order of increasing density) include particle...
|
Capacity : 150,000CBM/annum |
Plant and Machinery cost: Rs 5624 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 8236lakhs |
|
Cost of Project : 8236100000 |
The objective of formulating and compounding sterile preparations is to provide adosage form of a labeled drug, in the stated potency that is safe to...
|
Capacity : Ampoules 5 ml Size: 300,000 Th. Nos. /annum Ampoules 10 ml Size: 260,000 Th. Nos. /annum Ampoules 20 ml Size: 120,000 Th. Nos. /annum |
Plant and Machinery cost: Rs 9225 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 10518 lakhs |
|
Cost of Project : 1051800000 |
A hose is a flexible hollow tube designed to carry fluids from one location to another. Hoses are also sometimes called pipes, or more generally tubin...
|
Capacity : Automobile AC Hose: 300,000 Nos/Annum Fuel Hose: 500,000 Nos/Annum Hydraulic Hose:500,000 Nos/Annum Petrol Pump Hose: 200,000 Nos/Annum Tyres : 450,000 Nos/Annum |
Plant and Machinery cost: Rs 1020 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 2994 lakhs |
|
Cost of Project : 299400000 |
The alcohol industry is the commercial industry involved in the manufacturing, distribution, and sale of alcoholic beverages. Alcohol has assumed very...
|
Capacity : Extra Neutral Alcohol (ENA) : 15,000KLs/Annum Distilleries Dry Grain with Solubles (DDGS) by product: 7,350MT/Annum Fusel Oil (by product) : 24KLs/Ann |
Plant and Machinery cost: Rs 4637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 6572 lakhs |
|
Cost of Project : 657200000 |
Polyaluminium chloride (PAC) is a general name given to polyaluminium chloride compounds, namely polyaluminium chloride hydroxide and polyaluminium ch...
|
Capacity : Poly Aluminium Chloride Liquid Form: 16,500 MT/Annum Poly Aluminium Chloride Powder Form: 13,500 MT/Annum |
Plant and Machinery cost: Rs 1266 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 2418 lakhs |
|
Cost of Project : 241800000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1200mt/annum Activated Carbon (by product): 336mt/annum Sodium Carbonate (by product): 504 mt/annum |
Plant and Machinery cost: Rs 556 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 1200 lakhs |
|
Cost of Project : 120000000 |