Please choose a project below related to this category.
Aluminium fluoride is used in many industrial processes. It is one of the minor constituents added to the electrolytic cells during the production of...
|
Capacity : 6700 MT/Annum |
Plant and Machinery cost: Rs. 518 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1794 Lakhs |
|
Cost of Project : 179400000 |
Rice is grown over vast areas of land around the world and is a major staple food for more than half of the world population. Rice is an excellent sou...
|
Capacity : 80 MT/Day |
Plant and Machinery cost: Rs. 962 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.62 |
|
Break Even Point (BEP): 46.86 |
TCI : Cost of Project: Rs. 2113 Lakhs |
|
Cost of Project : 211300000 |
The egg processing operation separates eggs into different kinds of egg products: egg white, egg yolk, whole egg and several mixes i.e. by adding suga...
|
Capacity : 2.30 MT/Day |
Plant and Machinery cost: Rs.794 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs.1416 Lakhs |
|
Cost of Project : 141600000 |
Manganese is used in metallurgical industries in the form of ferro manganese. Ferro manganese contains about 80% Mn and 20% Fe. Generally ferro mangan...
|
Capacity : 24 MT/Day |
Plant and Machinery cost: 803 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 2695 Lakhs |
|
Cost of Project : 269500000 |
The word Enzyme brings to mind the enzymes studied in biology like trypsin and Insulin. However, as is common knowledge, the uses of enzymes are not...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs. 597 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs. 1114 Lakhs |
|
Cost of Project : 111400000 |
Candy Sugar, (or sweet diamonds as it is popularly called or mishri) is sparking white big crystal sugar obtained by cooling supersaturated sugar sol...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 637 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 3859 Lakhs |
|
Cost of Project : 0 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 777 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 1253 Lakhs |
|
Cost of Project : 125300000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 816 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 1820 Lakhs |
|
Cost of Project : 0 |
Biotechnology, with its knowledge-intensive nature and tremendous economic potential, has emerged as one of the rapidly growing sectors of the Indian...
|
Capacity : 1500 MT Amylase/Annum,1500 MT Proteases/Annum |
Plant and Machinery cost: 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 1118 Lakhs |
|
Cost of Project : 0 |
Kraft paper, Brown paper or wrapping paper is made from variety of raw materials, e.g. Bagasse, ground wood, straw, waste paper, in various combinatio...
|
Capacity : 15000 MT/Annum |
Plant and Machinery cost: 565 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 943 Lakhs |
|
Cost of Project : 94300000 |
A plastic syringe is a cylindrical tool used for many purposes, from medicine to mechanics, to arts, crafts and refilling inkjet printer cartridges. D...
|
Capacity : 22500000 Nos. 5 Ml Size/Annum, 22500000 Nos. 10 Ml Size/Annum |
Plant and Machinery cost: 636 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 837 Lakhs |
|
Cost of Project : 0 |
Bauxite ore is an important mineral used in producing alumina, the raw material that is in turn used for producing aluminum. Approximately 85% of Baux...
|
Capacity : 19998 MT/Annum Pure Alumina from Bauxite |
Plant and Machinery cost: 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 2113 Lakhs |
|
Cost of Project : 0 |