During the printing process, ink, dirt and other residue may accumulate on the blanket cylinders. The accumulation of such residues can cause various...
|
Capacity : 5000 Nos./day |
Plant and Machinery cost: 108 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 315 Lakhs |
|
Cost of Project : 0 |
Food freezing is a technique by which the fruits and vegetables are brought into below freezing temperature and stored in the same temperature in orde...
|
Capacity : 5 ton Frozen Foods.5000 Cans Ready to Eat Food 450 gms.5000 Pack Tomato Purees (200 gms.)5000 Bottles Tomato Sauces (500 gm.) |
Plant and Machinery cost: 56 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 703 Lakhs |
|
Cost of Project : 0 |
Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 198 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 567 Lakhs |
|
Cost of Project : 0 |
Tamarind is a fruit of highly soured nature having big trees all over India. Tamarind cultivation is used for the extraction of its fruit juice and p...
|
Capacity : 0.50 MT/day |
Plant and Machinery cost: 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 74 Lakhs |
|
Cost of Project : 0 |
These dyes are so powerful that very small amounts, comparatively, are needed to colour a large amount of material. The dyestuff should never be shake...
|
Capacity : 1500 MT/Annum |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : 8 Lakhs |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : - |
|
Cost of Project : 0 |
The Indian wine industry is in its nascent stage. The per capita consumption of wine in India is only 10 ml per annum as against 100 litres per year i...
|
Capacity : 10500 Ltrs/day |
Plant and Machinery cost: 453 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1218 Lakhs |
|
Cost of Project : 0 |
For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial. Bu...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |
Strawberry is one of the delicious fruits. It contains vitamins minerals, enzymes, fruit juice etc. Our daily need of food is incomplete unless we tak...
|
Capacity : 200 MT / Annum |
Plant and Machinery cost: 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 92 Lakhs |
|
Cost of Project : 0 |
We all are familiar of the fruit called Amla (Gooseberry). It is very commonly found in India, Ceylon, Malaya and China. It is very important fru...
|
Capacity : 20,000 Kg. / Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 10 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 168000 Pcs./Day |
Plant and Machinery cost: Rs. 50 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 136 Lakhs |
|
Cost of Project : 0 |
The term parboiling covers the operation to which the paddy is subjected before milling. Water and heat are the two main elements in the process. Afte...
|
Capacity : Parboiled Rice: 3000 MT/Annum, Broken Rice : 230 MT/A, Rice Flake 1500 MT/A, Corn Flakes:1500 MT/A |
Plant and Machinery cost: Rs. 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project Rs. 308 Lakhs |
|
Cost of Project : 0 |
Electrical power cables used for transmission and distribution purposes consist of conductors stranded from plain high conductively annealed copper w...
|
Capacity : 2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum |
Plant and Machinery cost: Rs. 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project Rs. 305 Lakhs |
|
Cost of Project : 0 |