Please choose a project below related to this category.
Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The Starch industry in I...
|
Capacity : 78300 MT /Annum |
Plant and Machinery cost: Rs.5340 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project:Rs. 6916 Lakhs |
|
Cost of Project : 691600000 |
Juice is a liquid that is naturally contained in fruit and vegetables. The fruit juice industry has made good progress in India. According to trade so...
|
Capacity : 4800000 Bottles/Annum |
Plant and Machinery cost: Rs.248 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project:Rs. 502 Lakhs |
|
Cost of Project : 50200000 |
Indian poultry sector has been growing at around 8-10% annually over the last decade with broiler meat volumes growing at more than 10% while table eg...
|
Capacity : 250000 Birds per Annum |
Plant and Machinery cost: Rs.1145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs.1784 Lakhs |
|
Cost of Project : 178400000 |
Copper Sulphate is of topical interest in the sense that copper is important metal used in India from ancient times. Copper sulphate is widely used as...
|
Capacity : 600 Nos. /annum |
Plant and Machinery cost: Rs.43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs.238 Lakhs |
|
Cost of Project : 23800000 |
Onion is one of the most important commercial vegetable crops grown in India. India is the second largest producer of onion in the world. Onion is one...
|
Capacity : 1000 MT/annum |
Plant and Machinery cost: Rs.66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs.275 Lakhs |
|
Cost of Project : 27500000 |
The demand for food of animal origin is increasing in India due to economic growth, population growth and urbanization, which in turn means greater us...
|
Capacity : 30,000 MT/Annum |
Plant and Machinery cost: Rs. 222 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1070 Lakhs |
|
Cost of Project : 107000000 |
Sanitary napkins known as sanitary pads are important part of the gynecological hygiene for every woman. A woman will use an average of 10000 pieces o...
|
Capacity : 1728,00,000 Pcs./Annum |
Plant and Machinery cost: Rs. 134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs 1624 Lakhs |
|
Cost of Project : 162400000 |
India is an agricultural country and livestock sector is an integral part of agriculture. Dairy farming from being traditional family run businesses t...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Karnataka, AP,...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
Onion is one of the most important commercial vegetable crops grown in India. Both immature and mature bulbs are used as vegetable and condiment. It c...
|
Capacity : 1000 MT/annum |
Plant and Machinery cost: 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: 275 Lakhs |
|
Cost of Project : 27500000 |
The 1st sanitary napkins were in the form of a cotton wool or similar stringy rectangular structure, sheathed with an absorbent liner. Disposable sani...
|
Capacity : 1728,00,000 Pcs./Annum |
Plant and Machinery cost: Rs. 134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs 1624 Lakhs |
|
Cost of Project : 162400000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |