The Sanitary napkin industry is closely connected with the mode of life, which is in turn directly correlated to housing. Accordingly this industry ha...
|
Capacity : 576000 Pcs/Day |
Plant and Machinery cost: Rs. 134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.41 |
|
Break Even Point (BEP): 34.73 |
TCI : Cost of Project: Rs. 1624 Lakhs |
|
Cost of Project : 162400000 |
Dehydrated Onions have been produced in small quantities since the nineteenth century. Dehydrated onions were supplied to British naval expeditions in...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: Rs.224 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.89 |
|
Break Even Point (BEP): 40.20 |
TCI : Cost of Project: Rs. 536 Lakhs |
|
Cost of Project : 53600000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs. 518 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.91 |
|
Break Even Point (BEP): 48.13 |
TCI : Cost of Project: Rs. 832 Lakhs |
|
Cost of Project : 0 |
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : 140 MT/Day |
Plant and Machinery cost: Rs. 358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 57.96 |
TCI : Cost of Project: Rs. 635 Lakhs |
|
Cost of Project : 63500000 |
Rice is an important food crop. It is consumed by more than half of the world’s population living in the developing countries. The demand of rice is i...
|
Capacity : 388 MT/Day |
Plant and Machinery cost: Rs. 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.02 |
|
Break Even Point (BEP): 47.16 |
TCI : Cost of Project: Rs. 1760 Lakhs |
|
Cost of Project : 176000000 |
In igneous rocks, which comprise 95% of the earth’s crust the average percentage concentration of manganous oxide is 0.124. This is small in compared...
|
Capacity : 10 MT/Day. |
Plant and Machinery cost: 256 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project:691 Lakhs. |
|
Cost of Project : 69100000 |
Fabric softener (also called fabric conditioner) is a conditioner used to prevent static cling and make fabric softer. It is available as a liquid, cr...
|
Capacity : Cationic Softener:320.0 Kgs/ Day.,Non Ionic Fabric Softener:320.0 Kgs/ Day.,Anionic Fabric Softener:360.0 Kgs/ Day. |
Plant and Machinery cost: Rs.33 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:Rs.172 Lakhs. |
|
Cost of Project : 17200000 |
Sanitary napkins have an important place in women's history and in the history of technology. 19th Century research into disposable sanitary napkins m...
|
Capacity : 576,000 Pcs/Day. |
Plant and Machinery cost: Rs.134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.41 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project: Rs.1624 Lakhs. |
|
Cost of Project : 162400000 |
Ferro manganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points than...
|
Capacity : Ferro Silicon:59.0 MT/Day.,Ferro Manganese:167.0 MT/Day.,Silico Manganese:130.5 MT/Day. |
Plant and Machinery cost: Rs.2493 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project :Rs4280 Lakhs. |
|
Cost of Project : 428000000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. When diapers become soiled, they require changin...
|
Capacity : Baby Diapers:45,000.0 Pckts/Day.,Adult Diapers:18,000.0 Pckts/Day., Sanitary Pads:63,000.0 Pckts/Day. |
Plant and Machinery cost: Rs.855 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project :Rs.2984 Lakhs. |
|
Cost of Project : 298400000 |
Rice flakes are tasty flakes that are created using rice grains. The process for creating rice flakes involves parboiling the rice, then flattening th...
|
Capacity : 10 MT/Day. |
Plant and Machinery cost: 52 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project :214Lakhs. |
|
Cost of Project : 21400000 |
Pre gelatinized starch is a processed carbohydrate used as a texturizer and or binder. It is typically derived from corn, waxy corn potato or tapioca....
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost Of Project : Rs. 475 Lakhs |
|
Cost of Project : 47500000 |