Please choose a project below related to this category.
Plastic floor tiles are known for some time Artificial synthetic marble the invention of the developing affordable resort, virtually replacing the use...
|
Capacity : 3.00 MT/day |
Plant and Machinery cost: Rs. 29 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 154 lakhs |
|
Cost of Project : 0 |
Cold storage industry is a very important and essential industry. The temperature is maintained low with the help of precision instruments. Cold stora...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
There are some essential oils which have property to repellant of mosquito. Mosquitoes cannot bear the flavour of essential oil though they do not die...
|
Capacity : 2000 BOTTLES/day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The contribution of thousands of medical luminances has been completed in the ayurvedic system to make it as one of the most wide as well as perfect s...
|
Capacity : 25 days/month |
Plant and Machinery cost: Rs. 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Rs. 171 lakhs |
|
Cost of Project : 0 |
The asbestos sheet was first manufactured in 1914 in Japan. Since then improvement have been repeatedly made in the quality, shape and manufacturing p...
|
Capacity : 1000 NOS./day |
Plant and Machinery cost: Rs. 81 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 291 lakhs |
|
Cost of Project : 0 |
Amla powder is largely used for the production of Ayurvedic medicine. There is good demand of the Herbal medicinal product. The dried fruits of E.ribe...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: 52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 154 Lakhs |
|
Cost of Project : 0 |
Most lead compounds are derived from pig lead (refined metal), usually via conversion to lead monoxide, commonly known as litharge. In general, lead c...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 66.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 230 Lakhs |
|
Cost of Project : 0 |
Contract farming is most commonly practiced by food processing firms. These firms have an interest in keeping raw material inflows at a stable level,...
|
Capacity : 75000 Nos. Bottle Fruit Juice/Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 2876 Lakhs |
|
Cost of Project : 0 |
Metals is general and steel particular can be worked into useful shapes by hammering or pressing. This method of metal working is known as forging. A...
|
Capacity : 90 MT/Day |
Plant and Machinery cost: 631 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 2926 Lakhs |
|
Cost of Project : 0 |
The manufacturing process of distribution transformers are quite similar to the process of power transformers. It consist of laminating cores, enamell...
|
Capacity : 1 Nos./Day |
Plant and Machinery cost: 40 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 209 Lakhs |
|
Cost of Project : 0 |
In India dairying has been practiced as a rural cottage industry since the remote past. The importance of milk is human diet especially for children a...
|
Capacity : 6680 Ltrs./Day |
Plant and Machinery cost: 123 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 436 Lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25% of the cost of a chemical process plant. The economics depends heavily on the pipe size and fabrication techniques...
|
Capacity : 300000 Nos./Day |
Plant and Machinery cost: 54 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 195 Lakhs |
|
Cost of Project : 0 |