Please choose a project below related to this category.
This substance, which occupies 21 percent of the earth’s atmosphere, has a number of very important uses. Oxygen is a colourless, odorless and tastel...
|
Capacity : 300000 Cylinders/Annum |
Plant and Machinery cost: 675 Lacs |
|
Working Capital : 100 Lacs |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1006 Lacs |
|
Cost of Project : 0 |
Every body use milk and milk products. A dairy is a place for handling milk and milk products. Technology refers to the application of scientific kno...
|
Capacity : Farming 200 Cows, 5000 Ltrs/Day, Processed Milk 34000 Lts/Day |
Plant and Machinery cost: 594 Lacs |
|
Working Capital : 440 Lacs |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 1866 Lacs |
|
Cost of Project : 0 |
Talcum powder is naturally available as magnesium silicate of monohydrate. It is largely used in the cosmetic and soap industries. It is also known as...
|
Capacity : 3000 MT/ANNUM |
Plant and Machinery cost: 31 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 60.00 |
TCI : 81 Lacs |
|
Cost of Project : 0 |
Gelatin is defined as a product obtained by the partial hydrolysis of collagen derived from the skin white connective tissue and bones of animals. As...
|
Capacity : 60 MT/ANNUM |
Plant and Machinery cost: 116 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 55.00 |
TCI : 220 Lacs |
|
Cost of Project : 0 |
Ply Board is wooden made board or wooden like raw materials largely used for making ply board. There is large use of ply board nowadays in making wood...
|
Capacity :
|
Plant and Machinery cost: Rs 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Rs 114 Lakhs |
|
Cost of Project : 0 |
Recycling of waste has become a necessity for environmental as well as for economic reasons. Plastics wastes being recycled in our country for over th...
|
Capacity : 500 kg/day |
Plant and Machinery cost: Rs. 28.00 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Rs. 65 Lakhs |
|
Cost of Project : 0 |
Compulsory state education begins at 5 years but permissive legislation allows local education authorities to build also for children of 3 to 5 years...
|
Capacity : 700 students |
Plant and Machinery cost: Rs 209 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Rs 687 Lakhs |
|
Cost of Project : 0 |
Glass industry in India is one of the prime industry where much more power is utilizing for controlling the production of glass continuously. It is n...
|
Capacity : 110 MW/Day |
Plant and Machinery cost: 453 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 494 Lakhs |
|
Cost of Project : 0 |
The invention of air entraining agents in 1939 has been termed a revolutionary development in concrete technology. The basic function of an air-entra...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 19 Lakhs |
|
Working Capital : Rs. 62.00 Lakhs |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Rs. 123.00 Lakhs |
|
Cost of Project : 0 |
Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The sy...
|
Capacity : 3000 nos./Day |
Plant and Machinery cost: Rs. 164 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 291 Lakhs |
|
Cost of Project : 0 |
There has been a little war going on out there b/w silicon and titanium, both metallic components of the sands around the world. Not long ago, the ve...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: Rs. 18 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs 63 Lakhs |
|
Cost of Project : 0 |
Most metals are found in nature in combined from other elements such as Oxygen, Sulfur etc. by adding energy during the processing of these metallic...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: Rs. 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Rs 112 Lakhs |
|
Cost of Project : 0 |