Please choose a project below related to this category.
Carburetors is a device that controls the power output and fuel feed of internal combustion spark-ignition engines generally used for automobiles, air...
|
Capacity : 100 Nos./Day |
Plant and Machinery cost: Rs. 29 Lakhs |
|
Working Capital : Rs. 17 Lakhs |
Rate of Return (ROR): 45.38 |
|
Break Even Point (BEP): 38.12 |
TCI : Rs. 70.0 Lakhs |
|
Cost of Project : 0 |
Native lead is occasionally found in traces but the chief ore is galena usually associated with zinc blend. Lead was known in ancient Egypt and Babylo...
|
Capacity : 11 MT/Day |
Plant and Machinery cost: Rs. 170 Lakhs |
|
Working Capital : Rs. 534 Lakhs |
Rate of Return (ROR): 31.59 |
|
Break Even Point (BEP): 50.14 |
TCI : Rs. 950 Lakhs |
|
Cost of Project : 0 |
Bright bars are basic materials used in the manufacture of various engineering product e.g. bolts, nuts, shafts, screw, hand tools, agricultural imple...
|
Capacity : 5.0 Tonnes/Day |
Plant and Machinery cost: Rs. 49 Lakhs |
|
Working Capital : Rs. 557.0 Lakhs |
Rate of Return (ROR): 36.77 |
|
Break Even Point (BEP): 42.40 |
TCI : Rs. 655.0 Lakhs |
|
Cost of Project : 0 |
Hot-dip galvanizing is usually a process of coating a steel surface with a layer of pure zinc or zinc coating along with a few alloying elements like...
|
Capacity : 80.0 MT/Day |
Plant and Machinery cost: Rs. 174.0 Lakhs |
|
Working Capital : Rs. 406.0 Lakhs |
Rate of Return (ROR): 42.82 |
|
Break Even Point (BEP): 42.19 |
TCI : Rs. 632 Lakhs |
|
Cost of Project : 0 |
The consumption of coolant is mainly estimated on the basis of automobile industry which has experienced a technological revolution in car manufacture...
|
Capacity : 200 liters/Day |
Plant and Machinery cost: Rs. 6.00 Lacs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs. 16.00 Lacs |
|
Cost of Project : 0 |
LPG valves are made from brass by forging. The total production of valves has been established 9 million numbers per annum in the country. Against thi...
|
Capacity : 1500 Nos/Day |
Plant and Machinery cost: Rs. 54 Lakhs |
|
Working Capital : Rs. 31 Lakhs |
Rate of Return (ROR): 24.67 |
|
Break Even Point (BEP): 61.77 |
TCI : Rs. 129 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Steel tube and P.V.C. pipes are largely used in the commercial, industrial and agricultural field. In agricultural field PVC pipes are largely used wh...
|
Capacity : 280 MT/ Day Steel Tubes120 MT/ Day PVC Pipes 5MW/Hr. Captive Power Plant |
Plant and Machinery cost: Rs. 2415 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.27 |
|
Break Even Point (BEP): 63.16 |
TCI : Rs. 4316 Lakhs |
|
Cost of Project : 0 |
Alloy steel casting has valuable properties like strength, toughness, and resistance to heavy and repeated impact, excellent ductility, resistance to...
|
Capacity : 2 Ton/ Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 48.47 |
|
Break Even Point (BEP): 46.94 |
TCI : - |
|
Cost of Project : 0 |
Sponge iron is the iron manufactured by refining iron ore. Iron ore is refined by burning off its wastes to a considerable extent. It is used as a sub...
|
Capacity : 450.00 MT/Day |
Plant and Machinery cost: Rs. 56 Crores |
|
Working Capital : Rs. 11 Crores |
Rate of Return (ROR): 37.49 |
|
Break Even Point (BEP): 49.41 |
TCI : Rs. 83 Crores |
|
Cost of Project : 0 |
Cargo containers, an item which is essential for transporting of essential commodities form one country to the other country. Now a days export and im...
|
Capacity : 96 Containers/Annum |
Plant and Machinery cost: Rs. 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 61.33 |
|
Break Even Point (BEP): 32.23 |
TCI : Rs. 164 Lakhs |
|
Cost of Project : 0 |
Steel is the generic name for a group of ferrous metals, which due to their abundance, durability, versatility and low cost are the most useful metall...
|
Capacity : 150 Ton/Day |
Plant and Machinery cost: Rs. 11 Crores |
|
Working Capital : Rs. 8 Crores |
Rate of Return (ROR): 68.83 |
|
Break Even Point (BEP): 28.48 |
TCI : Rs. 22 Crores |
|
Cost of Project : 0 |