Please choose a project below related to this category.
The automobile industry in India is at present undergoing considerable expansion and modernization with technology and know-how imported from Japan, U...
|
Capacity : 5000 Nos/Day |
Plant and Machinery cost: Rs. 29.00 lakhs |
|
Working Capital : Rs. 173.0 lakhs |
Rate of Return (ROR): 47.96 |
|
Break Even Point (BEP): 42.26 |
TCI : RS. 274 lakhs |
|
Cost of Project : 0 |
There is a huge demand for compact, high quality and high reliability sensors or instrument transformers for measuring currents and voltage in power p...
|
Capacity : 150 Km/Day |
Plant and Machinery cost: Rs. 810 Lakhs |
|
Working Capital : Rs. 106 Crores |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs. 115.82 Crores |
|
Cost of Project : 0 |
Aluminium is the most abundant metal in the world. It makes up 8% of the solid portion of the earth crust. Every country processes large supplies of a...
|
Capacity : 25000 MT/Annum |
Plant and Machinery cost: 729 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.18 |
|
Break Even Point (BEP): 79.30 |
TCI : 2571 Lakhs |
|
Cost of Project : 0 |
The importance of iron and steel among other materials is well known for industrialization and national economy. Basically all industries depend on ir...
|
Capacity : 1.67 MT/day |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.86 |
|
Break Even Point (BEP): 59.82 |
TCI : 142 Lakhs |
|
Cost of Project : 0 |
Since long people used to burn cotton in mud cups filled with oil. But candle manufacture started during World War-II. The candle is being used in eve...
|
Capacity : 500 Kgs/Day |
Plant and Machinery cost: Rs. 9 Lakhs |
|
Working Capital : Rs. 24.0 Lakhs |
Rate of Return (ROR): 58.35 |
|
Break Even Point (BEP): 37.41 |
TCI : Rs. 42 Lakhs |
|
Cost of Project : 0 |
Activated alumina is one of the various grades O alumina used extensively as industrial adsorbent because of their properties of large surface area an...
|
Capacity : 3.0 Ton/Day |
Plant and Machinery cost: Rs. 13 Lakhs |
|
Working Capital : Rs. 54 Lakhs |
Rate of Return (ROR): 80.01 |
|
Break Even Point (BEP): 29.88 |
TCI : Rs. 88 Lakhs |
|
Cost of Project : 0 |
Automobile workshop provide services of preventive maintenance of motor vehicles as well as for repairs and overhauls, Preventive maintenance cuts the...
|
Capacity : 10500 Nos./Annum |
Plant and Machinery cost: Rs. 12 Lakhs |
|
Working Capital : Rs. 15 Lakhs |
Rate of Return (ROR): 39.55 |
|
Break Even Point (BEP): 48.38 |
TCI : Rs. 106 Lakhs |
|
Cost of Project : 0 |
Carburetors is a device that controls the power output and fuel feed of internal combustion spark-ignition engines generally used for automobiles, air...
|
Capacity : 100 Nos./Day |
Plant and Machinery cost: Rs. 29 Lakhs |
|
Working Capital : Rs. 17 Lakhs |
Rate of Return (ROR): 45.38 |
|
Break Even Point (BEP): 38.12 |
TCI : Rs. 70.0 Lakhs |
|
Cost of Project : 0 |
Native lead is occasionally found in traces but the chief ore is galena usually associated with zinc blend. Lead was known in ancient Egypt and Babylo...
|
Capacity : 11 MT/Day |
Plant and Machinery cost: Rs. 170 Lakhs |
|
Working Capital : Rs. 534 Lakhs |
Rate of Return (ROR): 31.59 |
|
Break Even Point (BEP): 50.14 |
TCI : Rs. 950 Lakhs |
|
Cost of Project : 0 |
Bright bars are basic materials used in the manufacture of various engineering product e.g. bolts, nuts, shafts, screw, hand tools, agricultural imple...
|
Capacity : 5.0 Tonnes/Day |
Plant and Machinery cost: Rs. 49 Lakhs |
|
Working Capital : Rs. 557.0 Lakhs |
Rate of Return (ROR): 36.77 |
|
Break Even Point (BEP): 42.40 |
TCI : Rs. 655.0 Lakhs |
|
Cost of Project : 0 |
Hot-dip galvanizing is usually a process of coating a steel surface with a layer of pure zinc or zinc coating along with a few alloying elements like...
|
Capacity : 80.0 MT/Day |
Plant and Machinery cost: Rs. 174.0 Lakhs |
|
Working Capital : Rs. 406.0 Lakhs |
Rate of Return (ROR): 42.82 |
|
Break Even Point (BEP): 42.19 |
TCI : Rs. 632 Lakhs |
|
Cost of Project : 0 |
The consumption of coolant is mainly estimated on the basis of automobile industry which has experienced a technological revolution in car manufacture...
|
Capacity : 200 liters/Day |
Plant and Machinery cost: Rs. 6.00 Lacs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs. 16.00 Lacs |
|
Cost of Project : 0 |