Please choose a project below related to this category.
Extra Neutral Alcohol is a food grade alcohol. The product is used as a basic alcohol in distilled spirits like Vodka, Malawi Gin etc. In the pharmace...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Glass blocks or bricks are architectural products that allow light to pass through, while also providing a level of privacy or obscuration. Glass bloc...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Hosiery also referred to as legwear, describes the garments, worn directly on the feet and legs. The term hosiery is also being used for the type of k...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, this is eco-friendly vehicles for...
|
Capacity : 1,200 Nos per Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 324 Lakhs |
|
Cost of Project : 32400000 |
Production of Industrial Gases and Speciality Gases Mixture. Investment & Business Opportunities in Oxygen, Nitrogen and Argon Gas Manufacturing Plant...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Hydrazine Hydrate Manufacturing Industry. Investment Opportunities in Chemical Business Hydrazine is a colorless inorganic compound with odor sim...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Noodles, Vermicelli, Macaroni and Spaghetti Production Business. Start a Profitable Pasta Product Manufacturing Industry Macaroni is a traditiona...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Sulphuric Acid, Chlorosulphonic Acid, 23% Oleum. Business and Investment Opportunities in Chemical Industry Sulphuric acid also kno...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A microbrewery or craft brewery is a brewery that produces small amounts of beer (or sometimes root beer). The main raw material are Malt, yeast, wate...
|
Capacity : Craft Beer: 10000Ltrs./Day |
Plant and Machinery cost: Rs. 522 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs.1040lakhs |
|
Cost of Project : 1040100000 |
PVC material is difficult to ignite and self-extinguishing (when flame removed) property/characteristic make it important thermoplastic.PVC Conduit pi...
|
Capacity : PVC Conduit Pipes: 10MT/Day |
Plant and Machinery cost: Rs. 103 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs1300 lakhs |
|
Cost of Project : 1300000 |
Jute fabrics are strong, durable, light, color fast, attractive and cheaper than most fabrics made from other fibers.There is very simple sewing machi...
|
Capacity : Jute Shopping Bags: 2400Nos/Day |
Plant and Machinery cost: Rs. 4 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 82.00 |
TCI : Cost of Project : Rs. 22 lakhs |
|
Cost of Project : 2200000 |
Red oxide primer is a specially formulated coating used as a base coat for ferrous metals. Red-oxide primer serves a similar purpose to interior wall...
|
Capacity : Red Oxide Primer (Each Packed in 20 Ltrs Container) : 1000 Packs/Day Red Oxide Primer (Each Packed in 5 Ltrs Container) : 4000 Packs/Day |
Plant and Machinery cost: Rs. 292 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1016 lakhs |
|
Cost of Project : 101600000 |