Investment Opportunities & Business Ideas in Ethiopia, East Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Plastic Seals for Electricity Meters
Plastic Seals for Electricity Meters

Security seals are mechanisms used to seal meters in a way that provides tamper evidence and some level of security. Such seals can help to detect the...

Capacity :

20,000 Th. Nos. /annum

Plant and Machinery cost:

84 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

77.00

TCI :

Cost of Project: Rs 158 lakhs

Cost of Project :

15800000

Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...

Capacity :

25,000 KW/annum

Plant and Machinery cost:

449 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project 1126 lakhs

Cost of Project :

112600000

HDPE Pipes
HDPE Pipes

These HDPE pipes and fittings have a high degree of corrosion resistance, are light in weight. Yet tough and durable, have excellent, hydraulic proper...

Capacity :

1,440,000 Kgs. /annum

Plant and Machinery cost:

58 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: Rs357 lakhs

Cost of Project :

35700000

Multiblade Safety Razor
Multiblade Safety Razor

A safety razor is a shaving implement with a protective device positioned between the edge of the blade and the skin. The initial purpose of these pro...

Capacity :

Multiblade Safety Razor (2 Blade): 86,400,000 Nos/annum

Plant and Machinery cost:

Rs 313 lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project : Rs 826 lakhs

Cost of Project :

82600000

Surgical Cotton
Surgical Cotton

Surgical cotton is also known as absorbent cotton” or “cotton wool”. Surgical/Absorbent cotton is cleared de-oiled and bleached cotton packed in diffe...

Capacity :

Surgical Cotton :300,000kgs/annum

Plant and Machinery cost:

Rs 69 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

57.00

TCI :

Cost of Project: Rs 238 lakhs

Cost of Project :

23800000

Mustard Oil
Mustard Oil

Mustard/Rapeseed oil is the third largest edible oil produced in the world after Soy oil and Palm oil. At a production level of 13-14 million tons, it...

Capacity :

Mustard Oil:3000 MT/annum Deoiled cake:5,700 MT/annum

Plant and Machinery cost:

Rs 83 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: Rs 373 lakhs

Cost of Project :

37300000

Razor Blade
Razor Blade

Blade manufacture is an important industry in several of the industrially advanced countries of the world. Carbon steel blades made from high carbon s...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

POTATO POWDER
POTATO POWDER

Indian vegetable basket is incomplete without mentioning the king of vegetables-potato-a sustaining force and a culinary delight. Potato powder is inc...

Capacity :

1200 MT/annum

Plant and Machinery cost:

Rs 135 lakhs

Working Capital :

-

Rate of Return (ROR):

24.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project : Rs 397 lakhs

Cost of Project :

39700000

Production of PE Wax Emulsion (Polyethylene Wax Emulsion) Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Production of PE Wax Emulsion (Polyethylene Wax Emulsion) Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials ("man's first plastic") was discovered ver...

Capacity :

20 MT/Day

Plant and Machinery cost:

97 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

58.00

TCI :

Cost of Project 343 Lakhs

Cost of Project :

34300000

Production of Pectin from Citrus, Lemon and Orange Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Production of Pectin from Citrus, Lemon and Orange Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Pectin is a structural heteropolysaccharide contained in the primary cell walls of terrestrial plants. It was first isolated and described in 1825 by...

Capacity :

150,000Kgs/annum

Plant and Machinery cost:

1289 Lakhs

Working Capital :

-

Rate of Return (ROR):

23.00

Break Even Point (BEP):

44.00

TCI :

Cost of Project 1660 Lakhs

Cost of Project :

166000000

5 Star Hotel
5 Star Hotel

A hospitality unit such as a restaurant, hotel, or an amusement park consists of multiple groups such as facility maintenance and direct operations (s...

Capacity :

150 Nos of Room

Plant and Machinery cost:

1940 lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

38.00

TCI :

Cost of Project : Rs 4925 lakhs

Cost of Project :

492500000

Non-Formaldehyde Dye Fixing Agent for Reactive Dyes
Non-Formaldehyde Dye Fixing Agent for Reactive Dyes

Dyes and pigments are the most important colorants used to add a color or to change the color of something. They are widely used in the textile, pharm...

Capacity :

AluminiumSulphate : 180,000 Kgs/annum Biphenyl or Diphenyl : 180,000 Kgs/annum

Plant and Machinery cost:

19 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

71.00

TCI :

Cost of Project : Rs 52 lakhs

Cost of Project :

5200000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp