Please choose a project below related to this category.
There are so many fibres available which has property of non absorbing among those fibres are nylon, Terelene, polyesters etc are synthetic fibre. Sil...
|
Capacity : Black Braided Silk Surgical Sutures:250 Boxes/Day |
Plant and Machinery cost: Rs 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.20 |
|
Break Even Point (BEP): 54.09 |
TCI : Cost of Project:Rs 146 Lakhs |
|
Cost of Project : 14600000 |
Biscuits are an important product in human diet and are usually eaten with tea and are also used as weaning food for infants.Around the world Biscuits...
|
Capacity : Biscuits:2.4 MT/Day •Candy :1.2 MT/Day |
Plant and Machinery cost: Rs 94 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.72 |
|
Break Even Point (BEP): 65.01 |
TCI : Cost of Project:Rs 297 Lakhs |
|
Cost of Project : 29700000 |
Denim is a sturdy cotton warp-faced twill textile in which the weft passes under two or more warp threads. This twill weaving produces the familiar di...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 59.00 |
TCI : - |
|
Cost of Project : 0 |
A handicraft, sometimes more precisely expressed as artisanal handicraft or handmade, is any of a wide variety of types of work where useful and decor...
|
Capacity : Woven Baskets :166 Pcs/Day•Mat & Mat Articles:83 Pcs/Day •Lamp Shades:266 Pcs/ Day •Cane Furnitures:50 Pcs/Day |
Plant and Machinery cost: Rs 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project: Rs 92 Lakhs |
|
Cost of Project : 9200000 |
Bamboo is a tribe of flowering perennial evergreen plants in the grass family Poaceae, subfamily Bambusoideae, tribe Bambuseae; although, the forestry...
|
Capacity : •Bamboo Sticks: 1280 Kgs/Day |
Plant and Machinery cost: Rs 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 82 Lakhs |
|
Cost of Project : 8200000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 1387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 1802 Lakhs |
|
Cost of Project : 180200000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 166.7 MT/Day |
Plant and Machinery cost: Rs 1942 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 3201 Lakhs |
|
Cost of Project : 320100000 |
‘‘Cotton’ the white gold is one of the most important commercial; crops playing a key role in the economical, political and social affairs of the cou...
|
Capacity : Cotton Yarn: 24 MT/Day |
Plant and Machinery cost: Rs 4112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 5426 Lakhs |
|
Cost of Project : 542600000 |