Please choose a project below related to this category.
Reclaim rubber is no longer just a recycling activity—it’s a fast-evolving industrial opportunity powered by sustainability, cost efficien...
|
Capacity : Reclaimed Rubber: 15 MT Per Day Steel Wire Scrap (by Product): 3 MT Per Day Polyester Fibre (by Product): 1 MT Per Day |
Plant and Machinery cost: 258 |
|
Working Capital : N/A |
Rate of Return (ROR): 24 |
|
Break Even Point (BEP): 56 |
TCI :
|
|
Cost of Project : 838 |
India is seeing a growing agribusiness demand for Seed Processing Unit establishments for staples, like wheat and chickpeas. High yields and organized...
|
Capacity : Wheat Seed: 19 MT, Chickpea Seed: 13 MT Per Day |
Plant and Machinery cost: 50 |
|
Working Capital : N/A |
Rate of Return (ROR): 26 |
|
Break Even Point (BEP): 59 |
TCI :
|
|
Cost of Project : 348 |
Carbon Fiber Reinforced Polymer (CFRP) has transformed beyond just a material for aerospace labs into a booming industrial contender. CFRP boasts a un...
|
Capacity : 5,000 Kgs Per Day |
Plant and Machinery cost: 2973 |
|
Working Capital : N/A |
Rate of Return (ROR): 29 |
|
Break Even Point (BEP): 46 |
TCI :
|
|
Cost of Project : 4273 |
Caustic soda, or sodium hydroxide, has many uses in industry because it has many forms: solid, liquid, flake and pearl. Each form, solid and liquid, h...
|
Capacity : Caustic Soda Liquid 50%: 100 MT Per Day by Product Caustic Soda Flakes 25 MT Per Day by Product Caustic Soda Pearl 25 MT Per Day by Product Liquid Chlorine Gas 900 Kg Cylinder 90 MT Per Day by Product Hydrogen Gas 10 Kg Cylinder 5 MT Per Day |
Plant and Machinery cost: 29000 |
|
Working Capital : N/A |
Rate of Return (ROR): 25 |
|
Break Even Point (BEP): 33 |
TCI :
|
|
Cost of Project : 56500 |
Potato starch and flakes are valuable ingredients in the food industry. Obtaining starch from potatoes has the potential to be a highly profitable ven...
|
Capacity : Capacity: Potato Starch: 7,000 Kgs Per Day Potato Flakes: 5,000 Kgs Per Day |
Plant and Machinery cost: 203 |
|
Working Capital : N/A |
Rate of Return (ROR): 30 |
|
Break Even Point (BEP): 52 |
TCI :
|
|
Cost of Project : 877 |
Despite being called "mink blankets," these blankets do not contain mink fur. Rather, they are comprised of 100% synthetic materials that re...
|
Capacity : Double Bed Blankets (3.80 Kgs Size) 3,300 Nos Per Day Single Bed Blankets (2.50 Kgs Size) 2,800 Nos Per Day Baby Blankets (0.60 Kgs Size) 7,500 Nos Per Day |
Plant and Machinery cost: 2700 |
|
Working Capital : N/A |
Rate of Return (ROR): 27 |
|
Break Even Point (BEP): 42 |
TCI :
|
|
Cost of Project : 6000 |
A laundry soap bar is a solid detergent bar that is developed to be applied directly to the fabric or dissolved in water to create a detergent solutio...
|
Capacity : Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size) |
Plant and Machinery cost: 27 |
|
Working Capital : N/A |
Rate of Return (ROR): 27 |
|
Break Even Point (BEP): 72 |
TCI :
|
|
Cost of Project : 65 |
Silicon metal is a semi-metal or metalloid that is one of the purest forms of silicon. This is different from most other silicon compounds that are us...
|
Capacity : Silicon Metal 25,000 Kgs Per Day |
Plant and Machinery cost: 430 |
|
Working Capital : N/A |
Rate of Return (ROR): 32 |
|
Break Even Point (BEP): 68 |
TCI :
|
|
Cost of Project : 1696 |
Spices originate in the bark, seeds, roots, fruits, or flower buds of certain plants Some spices enhance the flavor of food, while other spices enhanc...
|
Capacity : Chilly 2,400 Kgs. Per Day Turmeric 1,000 Kgs. Per Day Coriander 520 Kgs. Per Day Cumin 480 Kgs. Per Day Garam Masala 80 Kgs. Per Day Chat Masala 80 Kgs. Per Day Sambhar Masala 80 Kgs. Per Day Curry Powder 80 Kgs. Per Day Punjabi Chole Masala 80 Kgs. Per Day |
Plant and Machinery cost: 150 |
|
Working Capital : N/A |
Rate of Return (ROR): 33 |
|
Break Even Point (BEP): 65 |
TCI :
|
|
Cost of Project : 418 |
Renewable energy sources are becoming more popular across the world and can now include compressed bio gas made from Napier grass. Napier grass is a t...
|
Capacity : CBG 5 TPD by Product Liquid Fertilizer 53 TPD By Product Dry Solid Fertilizer 21 TPD |
Plant and Machinery cost: 1100 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 45 |
TCI :
|
|
Cost of Project : 2800 |
The process of milling rice into edible rice for the market is the most time intensive process for rice. The target product of this process is whit ri...
|
Capacity : Milled Rice 24,000 MT Per Annum Rice Bran 1,860 MT Per Annum Rice Husk 6,480 MT Per Annum |
Plant and Machinery cost: 173 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 52 |
TCI :
|
|
Cost of Project : 824 |
Natural latex mattresses have a distinctive core material, which is sourced from the sap of the rubber tree (Hevea brasiliensis). After processing (us...
|
Capacity : Capacity: Latex Mattress Size: 75 x 72 x 5 inch 90 Nos. Per Day |
Plant and Machinery cost: 204 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 67 |
TCI :
|
|
Cost of Project : 626 |