Please choose a project below related to this category.
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
Lubricants are the products used for the lubrication of sliding or rolling elements. Product similar to these with respect to composition, manufactur...
|
Capacity : 600 Kg./day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 125 Lakhs |
|
Cost of Project : 0 |
Liquid Paraffins are the most commonly used compound in pharmaceuticals and medical practice etc. Now-a-days these are being employed as the major ra...
|
Capacity : 150 K Ltr/day H.L.P. & 140 K Ltr/day Isoparaffin |
Plant and Machinery cost: 427 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 972 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 100 MT/day |
Plant and Machinery cost: Rs. 240 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 1279 Lakhs |
|
Cost of Project : 0 |
Cement industry is one of the most important basic industries on which depends the economic health of a developing country. In fact the important indi...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: 105 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 175 Crores |
|
Cost of Project : 1750000000 |
The 20th century has seen the emergence of aluminium as a key industrial and strategic material, second to only steel in terms of importance and tonna...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: 2 Crores |
|
Working Capital : 15 Crores |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 18 Crores |
|
Cost of Project : 0 |
For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial. Bu...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |
In India three types of decorative and industrial laminated sheets are being manufactured usually being phenol formaldehyde or melamine formaldehyde...
|
Capacity : 50,00,000 Sq. Mt / Annum |
Plant and Machinery cost: 860 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1484 Lakhs |
|
Cost of Project : 0 |
In India three types of decorative and industrial laminated sheets are being manufactured usually being phenol formaldehyde or melamine formaldehyde...
|
Capacity : 50,00,000 Sq. Mt / Annum |
Plant and Machinery cost: 860 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1484 Lakhs |
|
Cost of Project : 0 |
Tyre is rubber shielded wheel of metal. The maximum use of tyre is captured by the automobile industry, because the automobiles cannot perform their...
|
Capacity : 5,00,000 Tyre / Annum |
Plant and Machinery cost: 279 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 861 Lakhs |
|
Cost of Project : 0 |
Solvent cement refers to any substance inorganic or organic synthetic that is capable of bonding other substances together by surface attachment. Pol...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 104 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 168000 Pcs./Day |
Plant and Machinery cost: Rs. 50 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 136 Lakhs |
|
Cost of Project : 0 |