The powder commonly employed for the cleaning of household utensils is known as utensils cleaning powder. It is available in the market by the various...
|
Capacity : 800 kgs/Day |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 34 Lakhs |
|
Cost of Project : 0 |
The vehicle owners should only use the minimum amount of ethylene glycol used based antifreeze to protect the system. The higher concentrate of antifr...
|
Capacity : 30 Lts. Coolant/Day, 300 Lts. Brake Oil/Day, 1000 Lts. Lube/Day, 1000 Lts. Grease/Day |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 70 Lakhs |
|
Cost of Project : 0 |
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 57.00 |
TCI : - |
|
Cost of Project : 0 |
With the development of pharmaceutical industries the use of disposable syringes and needles will also develop. With the population growth and lack of...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : - |
|
Cost of Project : 0 |
Activated carbon is a non graphite form of carbon and is microcrystalline in nature. It is extensively used in various industries as a very good absor...
|
Capacity : 5 Tons/Day |
Plant and Machinery cost: 67 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 51.00 |
TCI : 244 Lakhs |
|
Cost of Project : 0 |
The plastic in India plays a very important key role in industrialization. A wide spectrum of plastics and its articles have touched the life of every...
|
Capacity : 50,000 Plastic Glass, 25,000 Plastic Cups |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 51.00 |
TCI : 69 Lakhs |
|
Cost of Project : 0 |
Before going to various rubber compounding ingredients as applied in the rubber industry in detail, we would like to clarify the term compounding as a...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 86 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 63.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 407 Lakhs |
|
Cost of Project : 0 |
The safety razor is providing with guards on both sides of the cutting edges, which restrain the age from digging into the skin. Development in razors...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Selenium is a non-metallic element. Its name was derived from selene (moon, in Greek). The element has been found in cavities of vesuvian lavas and in...
|
Capacity : 400 Nos./Day (Thickness Of Coating 1 Mm. Length Of Drum 20 Inch, Diameter Of Drum 10 Inch.) |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 48.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium chloride Hydroxide, Aici products, commonly known as polyaluminium chlorides (P.A.C.), are used for a wide variety of industrial applicatio...
|
Capacity : 1.50 Mt/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 26 Lakhs |
|
Cost of Project : 0 |
Through bringing about a permanent union between the dyes and the yarn/fabric the yarns/textile are so colored that the colour is fast and is not ord...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 236 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 48.00 |
TCI : 518 Lakhs |
|
Cost of Project : 0 |
The production of poultry in the us and generally throughout the world is carried out by a highly specialized, efficient poultry industry that has be...
|
Capacity : 1 Lakhs Eggs/Day |
Plant and Machinery cost: 15 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 334 Lakhs |
|
Cost of Project : 0 |