Please choose a project below related to this category.
Shoe Polish is commonly used for shining shoes. They consist of waxes and solvents. Shoes polish is available in a number of colours e.g. black, brown...
|
Capacity : 200 kgs/Day |
Plant and Machinery cost: Rs. 3.00 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.73 |
|
Break Even Point (BEP): 4382.00 |
TCI : Rs. 24 Lakhs |
|
Cost of Project : 0 |
Diamond blade is an instrument or cutting machines, which is broadly used for cutting of very hard materials. It is basically manufactured by using of...
|
Capacity : 20000 Nos./Day |
Plant and Machinery cost: Rs. 81 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.90 |
|
Break Even Point (BEP): 73.60 |
TCI : Rs. 143 Lakhs |
|
Cost of Project : 0 |
Aluminium is the most abundant metal in the world. It makes up 8% of the solid portion of the earth crust. Every country processes large supplies of a...
|
Capacity : 25000 MT/Annum |
Plant and Machinery cost: 729 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.18 |
|
Break Even Point (BEP): 79.30 |
TCI : 2571 Lakhs |
|
Cost of Project : 0 |
Since long people used to burn cotton in mud cups filled with oil. But candle manufacture started during World War-II. The candle is being used in eve...
|
Capacity : 500 Kgs/Day |
Plant and Machinery cost: Rs. 9 Lakhs |
|
Working Capital : Rs. 24.0 Lakhs |
Rate of Return (ROR): 58.35 |
|
Break Even Point (BEP): 37.41 |
TCI : Rs. 42 Lakhs |
|
Cost of Project : 0 |
Cargo containers, an item which is essential for transporting of essential commodities form one country to the other country. Now a days export and im...
|
Capacity : 96 Containers/Annum |
Plant and Machinery cost: Rs. 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 61.33 |
|
Break Even Point (BEP): 32.23 |
TCI : Rs. 164 Lakhs |
|
Cost of Project : 0 |
Soaps contain too much alkali which is bad for hair and scalp. Shampoos are safer, they are designed to clean the hair and scalp without seriously red...
|
Capacity : 40 Ltrs./ Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The growing environmental concern of the last decade and more has also shifted the focus to the use of ecologically friendly products which has in tur...
|
Capacity : 1.83 Tonnes/Day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : Rs. 10 Lakhs |
Rate of Return (ROR): 69.71 |
|
Break Even Point (BEP): 40.53 |
TCI : Rs. 26 Lakhs |
|
Cost of Project : 0 |
Glass Reinforced Concrete is a composite consisting of a mortar of hydraulic cement & fine aggregate reinforced with alkali resistant glass fibres. GR...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs. 14 Lakhs |
|
Working Capital : Rs. 34 Lakhs |
Rate of Return (ROR): 39.36 |
|
Break Even Point (BEP): 43.79 |
TCI : Rs. 81 Lakhs |
|
Cost of Project : 0 |
Sea water largely used for marketing industrial common salts. As a whole industrial salt projects are good projects provided sound modern technology a...
|
Capacity : 250 MT/Day |
Plant and Machinery cost: RS. 91 Lacs |
|
Working Capital : RS. 234 Lacs |
Rate of Return (ROR): 20.36 |
|
Break Even Point (BEP): 63.12 |
TCI : RS. 513 Lacs |
|
Cost of Project : 0 |
The term alkyd was first used by Kienle in 1927 to describe the polyesters resulting from the reaction of polyhydric alcohols and poly functional acid...
|
Capacity : 5.00 MT /Day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : Rs. 184 Lakhs |
Rate of Return (ROR): 29.88 |
|
Break Even Point (BEP): 49.48 |
TCI : Rs. 327 Lakhs |
|
Cost of Project : 0 |
Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro manganese...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 104 Lakhs |
|
Working Capital : Rs. 885.00 Lakhs |
Rate of Return (ROR): 66.12 |
|
Break Even Point (BEP): 40.99 |
TCI : Rs. 1129.00 Lakhs |
|
Cost of Project : 0 |
Ferro Manganese, an alloy of Fe and Mn (70-80%) is obtained by smelting a mixture of iron and manganese ore with carbon in blast furnace, Manganese su...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs. 50 Lakhs |
|
Working Capital : Rs. 109 Lakhs |
Rate of Return (ROR): 47.43 |
|
Break Even Point (BEP): 68.36 |
TCI : Rs. 226 Lakhs |
|
Cost of Project : 0 |