Please choose a project below related to this category.
Starches are modified to enhance their performance in different applications. Starches may be modified to increase their stability against excessive h...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Sorbitol, a polyol (sugar alcohol), is a bulk sweetener. Sorbitol is produced either from starch hydrolysates, from dextrose syrup, or from dextrose m...
|
Capacity : 40.0 Tonnes/Day |
Plant and Machinery cost: 1 |
|
Working Capital : 0 |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : 1 |
|
Cost of Project : 0 |
Manganese (Mn), is a chemical element, one of the silvery-white, hard, brittle metals of Group VII b of the periodic table. It was recognized as an el...
|
Capacity : 1200 MT/Annum |
Plant and Machinery cost: 123 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 316 Lakhs |
|
Cost of Project : 0 |
The most commonly used cement in the world is Portland cement, which is formed at high temperatures that chemically combine the ingredients into new c...
|
Capacity : 75000 MT/Annum |
Plant and Machinery cost: 433 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 727 Lakhs |
|
Cost of Project : 72700000 |
Lube oil is a substance (often a liquid) introduced between two moving surfaces to reduce the friction between them, improving efficiency and reducing...
|
Capacity : 15000 Kls./Annum |
Plant and Machinery cost: 142 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 804 Lakhs |
|
Cost of Project : 0 |
EMU (Dromaius novaehollandiae) bird belong to ratite group has high economic value for their meat, eggs, oil, skin and feathers. Meat from emu is of h...
|
Capacity : Meat 20,000 Kgs., EMU Chick 5000 Nos., EMU Oil 4000 Kgs., Eggs 20,000 Nos. /Annum |
Plant and Machinery cost: 44 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 759 Lakhs |
|
Cost of Project : 0 |
The 20th century has seen the emergence of aluminium as a key industrial and strategic material, second to only steel in terms of importance and tonna...
|
Capacity : 21600 MT/Annum |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 2020 Lakhs |
|
Cost of Project : 0 |
Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly and v...
|
Capacity : 4800 MT/Annum |
Plant and Machinery cost: 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 129 Lakhs |
|
Cost of Project : 0 |
Rice has been and continues to be the largest source of human nutrition. Rice bran is a by-product of the rice milling process. Rice bran is the most...
|
Capacity : 8100 MT/Annum |
Plant and Machinery cost: 486 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 804 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : 90,000 MT/Annum |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
GOOD SCOPE FOR ALUMINIUM EXTRUSION PLANT Extrusion is a process equally suitable for the simplest shapes and for the most complex for the wide range...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 738 Lakhs |
|
Cost of Project : 0 |
Wood waste is, by far, the largest portion of the waste stream generated from wood working Industry. Almost everyone in the woodworking business has a...
|
Capacity : 180000 Nos./Annum |
Plant and Machinery cost: 70 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 136 Lakhs |
|
Cost of Project : 0 |