Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. Pig...
|
Capacity : 10 Lakh MT/Month |
Plant and Machinery cost: 38 Crores |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 388 Crores |
|
Cost of Project : 0 |
In view of the important of tomato either fresh or processed in the daily diet due to the high nutritive value, there are good potentials to develop t...
|
Capacity : 12 Ton/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 469 Lakhs |
|
Cost of Project : 0 |
Grape is considered as a sophisticated fruit from the very old times. It is cherished as fresh fruit, stored as raising, drinks as wines and medicines...
|
Capacity : Farming Land Area 75 Hectares Farming, Watering and Observing/day 16 Hours Up to 5 Years |
Plant and Machinery cost: 28 Lakh |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 52 Lakhs |
|
Cost of Project : 0 |
Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by the...
|
Capacity : 139 Lakh MT/Annum |
Plant and Machinery cost: 1030 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1163 Lakhs(Cost of Project) |
|
Cost of Project : 0 |
Coal is an extremely heterogeneous, complex material that is difficult to characterize. Coal is a rock formed by geological process and is composed of...
|
Capacity : 1350 Lakh MT/Annum (Job Work) |
Plant and Machinery cost: 752 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 972 Crores |
|
Cost of Project : 0 |
Banana is the one of richest iron source green vegetable. It can be preserved for 3 months or more by reducing moisture in it. This may be done by dry...
|
Capacity : 100 kgs./Day |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 18 Lakhs |
|
Cost of Project : 0 |
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
Lychee is one of the tropical fruits which is mainly available in Bihar, and Eastern part of India. It is one of the healthy fruit juice. It will help...
|
Capacity : 1,50,000 Kgs./Annum |
Plant and Machinery cost: 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: 39 lakhs |
|
Cost of Project : 3900000 |
The industry grow steadily based soundly on new and expanding markets created largely by its own study of the properties of aluminium and of the avenu...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.00 |
|
Break Even Point (BEP): 61.00 |
TCI : 1898 Lakhs |
|
Cost of Project : 0 |
Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Other...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1875 Lakhs |
|
Cost of Project : 0 |
To think of steel first of all a rod or a bar as you may call it comes to the mind of a common man in India. Steel rods are required even for making...
|
Capacity : 500 MT/Day |
Plant and Machinery cost: 39 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 145 Crores |
|
Cost of Project : 0 |
Hot dip galvanizing is a process in which an adherent, protective coating of zinc compounds is developed on the surface of iron and steel products by...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: RS. 176 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 859 Lakhs |
|
Cost of Project : 0 |