Please choose a project below related to this category.
Granite aggregates (pieces) are obtained from block cutting unit by cutting of Granite Gang saw blocks. After careful selection of each piece of equip...
|
Capacity : 42750 MT/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 82.00 |
TCI : Cost of Project 72 Lakhs |
|
Cost of Project : 0 |
The production of poultry in the United States and generally throughout the world is carried out by a highly specialized, efficient poultry industry...
|
Capacity : 5000 layers/Annum; 1000 Birds/Week |
Plant and Machinery cost: 3 Lakh |
|
Working Capital : |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 41 Lakh (one month W/C.) |
|
Cost of Project : 0 |
The importance of iron & steel among other materials is well known for industrialization and national economy. Metal fabrication is the group of enti...
|
Capacity : 2 MT/day |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 131 Lakhs (W/c. 2 month) |
|
Cost of Project : 0 |
Ferro alloys are used in making alloy steels and castings of different special types as addition agents. Ferro alloys are usually made in electric-ar...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 79 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 386 Lakhs |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. Potatoes are consumed not only as a fresh vegetable, but also in a variety of processed forms. P...
|
Capacity : 120 MT / Annum |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project : 268 Lakhs |
|
Cost of Project : 0 |
Glass is so much a part of our daily life that we cannot imagine living without it. Glassware is used both by the consumer as well as by the Governmen...
|
Capacity : 1500 MT /Annum |
Plant and Machinery cost: 91 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Cost of Project : 193 Lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25 percent of the cost of a chemical-process plant. The installed cost of piping systems varies widely with the materi...
|
Capacity : 1500 MT / Annum Tubes, 600 MT/Annum Fittings |
Plant and Machinery cost: 554 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 752 Lakhs |
|
Cost of Project : 0 |
A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivotal...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 352 lakhs |
|
Cost of Project : 0 |
Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 2396 lakhs |
|
Cost of Project : 0 |
There are hundreds of commercial varieties of cassava in various equatorial regions. These varieties fall into two main categories: Manihot palmate an...
|
Capacity : (Cassava Flour 3000, Starch 30000, Gari 1500, Cuscus 1500) MT / Annum |
Plant and Machinery cost: Rs. 400 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 84.00 |
TCI : Cost of Project : Rs. 1500 Lacs |
|
Cost of Project : 0 |
The production of G.I. Wire from H.B. wire is not complicated. In case of H.B. wire drawing from H.B. bars, certain mechanical process is used. An imp...
|
Capacity : 8.00 MT./day |
Plant and Machinery cost: Rs. 70 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 419 lakhs |
|
Cost of Project : 0 |
Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs. 2 crores |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |