Please choose a project below related to this category.
Rabbits are warms blooded mammals possessing a hairy coat or fur or quills on their body. Flesh of hares and rabbit is reported to be eastern in many...
|
Capacity : 5000 Angora rabbit Farming, 2 MT Rabbit feed/hr,100 kg Rabbit Yarn wool |
Plant and Machinery cost: 611 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 919 Lakh |
|
Cost of Project : 0 |
Calcium carbonate occurs naturally as the principal constituent of limestone, marble and chalk. Powdered calcium carbonate is produced by two metho...
|
Capacity : 300 MT / Day |
Plant and Machinery cost: 12 Crores |
|
Working Capital : - |
Rate of Return (ROR): 85.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 29 Crores |
|
Cost of Project : 0 |
Garlic powder means garlic in powder form. Powder form means moisture less or dehydrated form. In other words, dehydrated garlic is in flour form. Du...
|
Capacity : 300 Kgs / Day |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 64 Lakhs |
|
Cost of Project : 0 |
Fruits naturally possessing relatively large amount of pectin include lemons, bitter oranges, apples, quinees, currants and plums. It is less plentif...
|
Capacity : 460 Kg. / Day |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 266 Lakhs |
|
Cost of Project : 0 |
Manufacturing of steel tubes & pipes a Mechanical Engineering is mostly produced in large scale. ERW steel tubes are chiefly used in bicycles, transf...
|
Capacity : 3600 MT / Annum |
Plant and Machinery cost: 115 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 234 Lakhs |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various proce...
|
Capacity : 18000 MT / Annum |
Plant and Machinery cost: 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 499 Lakhs |
|
Cost of Project : 0 |
Fresh tomatoes are very refreshing and appetizing. They are a good source of vitamin C. Most of the tomatoes products are made from tomato pulp, which...
|
Capacity : 1200 MT / Annum |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 130 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 66 Lakhs |
|
Cost of Project : 0 |
Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enough...
|
Capacity : 30,000 MT/ Annum each ores |
Plant and Machinery cost: 896 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 3528 Lakhs |
|
Cost of Project : 0 |
Now-a-days, the use of master batches is the most convenient way of colouring plastics. In master batches, pigment / additives in high concentration a...
|
Capacity : 300 MT / Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 82 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manufact...
|
Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal. |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 219 Lakhs |
|
Cost of Project : 0 |