Please choose a project below related to this category.
Indian poultry sector has been growing at around 8-10% annually over the last decade with broiler meat volumes growing at more than 10% while table eg...
|
Capacity : 250000 Birds per Annum |
Plant and Machinery cost: Rs.1145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs.1784 Lakhs |
|
Cost of Project : 178400000 |
The demand for food of animal origin is increasing in India due to economic growth, population growth and urbanization, which in turn means greater us...
|
Capacity : 30,000 MT/Annum |
Plant and Machinery cost: Rs. 222 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1070 Lakhs |
|
Cost of Project : 107000000 |
India is an agricultural country and livestock sector is an integral part of agriculture. Dairy farming from being traditional family run businesses t...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Karnataka, AP,...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Maize is consti...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
Potato is widely consumed as food all over the world. It contains the starch as a major carbohydrate. Surplus and cull potatoes are used as feed for l...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: Rs. 517 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 899 Lakhs |
|
Cost of Project : 89900000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 14400 MT/annum |
Plant and Machinery cost: Rs. 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project: Rs. 202 Lakhs |
|
Cost of Project : 20200000 |
Banana is the largest produced and maximum consumed amongst the fruits cultivated in India. It is known as the ‘common man’s fruit’. It is highly nutr...
|
Capacity : 2160 MT/annum |
Plant and Machinery cost: Rs. 155 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs. 519 Lakhs |
|
Cost of Project : 51900000 |
Construction industry is one of the fastest growing sectors in India. Rapid construction activity and growing demand of houses has lead to the short f...
|
Capacity : 15 Lakh Nos. /annum |
Plant and Machinery cost: Rs. 152 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs. 426 Lakhs |
|
Cost of Project : 42600000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs. 518 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.91 |
|
Break Even Point (BEP): 48.13 |
TCI : Cost of Project: Rs. 832 Lakhs |
|
Cost of Project : 0 |
Glass making, one of the oldest of industries, has had a fascination for man throughout the ages. The transmutation of common sand and earth into a ge...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: Rs. 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.48 |
|
Break Even Point (BEP): 53.71 |
TCI : Cost of Project: Rs. 499 Lakhs |
|
Cost of Project : 49900000 |