Profile Goat is one of the world’s smallest domesticated livestock, have been actively managed for food and fiber earlier and longer than cattle and...
|
Capacity : 1000 Goats |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 115 Lakhs |
|
Cost of Project : 0 |
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile Rice husk ash is a unique source of high grade amorphous silica. The silica present in rice husk, being of biogenic origin, is inherently amo...
|
Capacity : 300 Kg/day |
Plant and Machinery cost: 246 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
PROFILE: Shrimp farming has developed widely through the desire to provide for increasing demands and continues to grow economically despite any envi...
|
Capacity : 400 MT shrimp/Annum in two crops,Shrimp farming in 35 hectares, 20 ponds, each pond-1 hectares |
Plant and Machinery cost: 560 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 1570 Lakhs |
|
Cost of Project : 0 |
PROFILE: Shrimp farming has developed widely through the desire to provide for increasing demands and continues to grow economically despite any envi...
|
Capacity : 400 MT shrimp/Annum in two crops,Shrimp farming in 35 hectares, 20 ponds, each pond-1 hectares |
Plant and Machinery cost: 560 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 1570 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE The maize also called "Corn or Indian Corn" is widely cultivated in India; Maize ranks high among the four or five principal cereal c...
|
Capacity : - |
Plant and Machinery cost: 3175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 7310 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Potato starch is starch extracted from potatoes. The cells of the root tubers of the potato plant contain starch grains (leucoplasts)...
|
Capacity : 45000 MT/Annum |
Plant and Machinery cost: 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of the project: 1618 Lakhs |
|
Cost of Project : 161800000 |
PRODUCT PROFILE Liquefied Petroleum Gas is a Propane/Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE Banana powder is a powder made from processed bananas. Banana is one of the most abundant fruit crops in India. It is also one of the...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of project: 539 Lakhs |
|
Cost of Project : 53900000 |
PRODUCT PROFILE Rice bran is the most important source of edible oil among the unconventional sources. Rice bran is the brown coating around the whit...
|
Capacity : 5100 MT/Annum, Refined rice bran oil, 24900MT/Annum, De oiled rice bran oil cake (byproduct) |
Plant and Machinery cost: 757 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of project: 1243 Lakhs |
|
Cost of Project : 124300000 |
Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90,000 Kg /Annum |
Plant and Machinery cost: 285 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 524 Lakhs |
|
Cost of Project : 52400000 |
With the phenomenal increase in number of automobiles in India during recent years the demand of tyres as original equipment and as replacement has al...
|
Capacity : 12,000 MT/Annum Reclaim Rubber,3,000 MT/Annum Steel by Product |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 596 Lakhs |
|
Cost of Project : 59600000 |