Profile Rubber powder is one of the major byproduct of waste tyre recycling. Rubber powder has large number of use in the different section of the in...
|
Capacity : 18 MT/day |
Plant and Machinery cost: 50 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 710 Lakh |
|
Cost of Project : 0 |
Profile Tempered glass is made from normal annealed glass via a thermal tempering process in which the glass is subjected to heat till its softening...
|
Capacity : 800 Sq mt/day |
Plant and Machinery cost: 189 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 559 Lakh |
|
Cost of Project : 55900000 |
Profile Goat and sheep rearing is the backbone of economy of small and landless farmers in India. It is an insurance against crop failure and provide...
|
Capacity : Goats: 500 Male & 500 Female Sheep: 500 Male & 500 Female |
Plant and Machinery cost: 11 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 209 Lakh |
|
Cost of Project : 0 |
Profile Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The products fr...
|
Capacity : - |
Plant and Machinery cost: 216 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of the Project : 630 Lakh |
|
Cost of Project : 63000000 |
Profile Goat is one of the world’s smallest domesticated livestock, have been actively managed for food and fiber earlier and longer than cattle and...
|
Capacity : 1000 Goats |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 115 Lakhs |
|
Cost of Project : 0 |
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile Rice husk ash is a unique source of high grade amorphous silica. The silica present in rice husk, being of biogenic origin, is inherently amo...
|
Capacity : 300 Kg/day |
Plant and Machinery cost: 246 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
PROFILE: Shrimp farming has developed widely through the desire to provide for increasing demands and continues to grow economically despite any envi...
|
Capacity : 400 MT shrimp/Annum in two crops,Shrimp farming in 35 hectares, 20 ponds, each pond-1 hectares |
Plant and Machinery cost: 560 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 1570 Lakhs |
|
Cost of Project : 0 |
PROFILE: Shrimp farming has developed widely through the desire to provide for increasing demands and continues to grow economically despite any envi...
|
Capacity : 400 MT shrimp/Annum in two crops,Shrimp farming in 35 hectares, 20 ponds, each pond-1 hectares |
Plant and Machinery cost: 560 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 1570 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE The maize also called "Corn or Indian Corn" is widely cultivated in India; Maize ranks high among the four or five principal cereal c...
|
Capacity : - |
Plant and Machinery cost: 3175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 7310 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Potato starch is starch extracted from potatoes. The cells of the root tubers of the potato plant contain starch grains (leucoplasts)...
|
Capacity : 45000 MT/Annum |
Plant and Machinery cost: 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of the project: 1618 Lakhs |
|
Cost of Project : 161800000 |
PRODUCT PROFILE Liquefied Petroleum Gas is a Propane/Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |