Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...
|
Capacity : Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 586 lakhs |
|
Cost of Project : 58600000 |
Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total production surpassing that of wheat...
|
Capacity : Maize Starch : 60MT/Day Sorbitol : 30MT/Day Liquid Glucose: 30MT/Day Dextrose Monohydrate: 30MT/Day Dextrose Anhydrous: 15MT/Day Gluten |
Plant and Machinery cost: 6690 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs10721 lakhs |
|
Cost of Project : 1072100000 |
Gypsum board, also known as “drywall” or “plaster board,” consists of a core of gypsum surrounded with a paper covering. These gypsum board products i...
|
Capacity : Gypsum Plaster Board (Size 2440x1220x12 mm):10000 Sq.Mt./day |
Plant and Machinery cost: 549 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 3188 lakhs |
|
Cost of Project : 318800000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : 300000 Nos./day |
Plant and Machinery cost: 4684 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 10012 lakhs |
|
Cost of Project : 1001200000 |
Aluminium beverage cans are every day commodities that people come across on a regular basis, whether it’s while they are grocery shopping, taking the...
|
Capacity : 15,050,000 Pcs. /annum |
Plant and Machinery cost: 172 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 712 lakhs |
|
Cost of Project : 71200000 |
Lime is manufactured from lime stone. Lime is mainly used for manufacture of hydrated lime. Hydrated lime is a dry powder obtained by treating quick l...
|
Capacity : 600 MT/Day |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project 548 Lakhs |
|
Cost of Project : 54800000 |
Pectin is a structural heteropolysaccharide contained in the primary cell walls of terrestrial plants. It was first isolated and described in 1825 by...
|
Capacity : 150,000Kgs/annum |
Plant and Machinery cost: 1289 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project 1660 Lakhs |
|
Cost of Project : 166000000 |
An electric motor is a device converting electrical energy into mechanical energy (usually a torque). This conversion is usually obtained through the...
|
Capacity : 60,000 Nos/annum |
Plant and Machinery cost: 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 313 lakhs |
|
Cost of Project : 31300000 |
Fruit juices are spray dried in order to have a long shelf life, reduces storage place requirement and lower cost of bulk packing. Fruit juice powders...
|
Capacity : Spray Dried Pineapple Juice Powder : 500Kgs/day Spray Dried Orange Juice Powder : 168Kgs/day Dehydrated Beetroot Powder : 168Kgs/day Dehydrated Carrot Powder : 168 Kgs/day |
Plant and Machinery cost: 220 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: 544 lakhs |
|
Cost of Project : 54400000 |
Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...
|
Capacity : Prestressed Concrete Cement Electric Poles: 60,000nos/annum |
Plant and Machinery cost: Rs 304 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 713 lakhs |
|
Cost of Project : 71300000 |
Pectin is a naturally occurring substance (a polysaccaride) found in all plant tissue, calcium pectin being present between the cell walls and serving...
|
Capacity : Pectin: 150,000Kgs/annum |
Plant and Machinery cost: Rs 1289 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 1660 lakhs |
|
Cost of Project : 166000000 |
Wire means Solid conductor or Insulated conductor which has strength and with cover or without cover and Cable means Insulated conductor (Solid or Str...
|
Capacity : Aluminium Wire (AAAC) Conductor: 900 MT/Annum Aluminium Wire (ACSR) Conductor: 400 MT/Annum Aluminium Cables: 450MT/Annum |
Plant and Machinery cost: Rs 314 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : Rs 579 lakhs |
|
Cost of Project : 57900000 |