Please choose a project below related to this category.
PSC poles stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These p...
|
Capacity : Pre-Stressed Concrete Electric Poles: 200 Nos./Day |
Plant and Machinery cost: 158 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 462 lakhs |
|
Cost of Project : 46200000 |
Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total production surpassing that of wheat...
|
Capacity : Maize Starch: 17520 MT /Annum Sorbitol: 3000 MT/Annum Liquid Glucose: 3000 MT/ Annum Dextrose Monohydrate: 3000 MT/ Annum Dextrose Anhydrous: 1500 MT/ Annum Gluten: 4590 MT/ Annum Maltodextrin: 1500 MT/ Annum Ge |
Plant and Machinery cost: 4160 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 6928 lakhs |
|
Cost of Project : 692800000 |
Starches are inherently unsuitable for most applications and, therefore, must be modi?ed chemically and/or physically to enhance their positive attrib...
|
Capacity : Wall Paper Starch: 32 MT /Day |
Plant and Machinery cost: Rs 52 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project: Rs 367 lakhs |
|
Cost of Project : 36700000 |
Aluminium foil is aluminium prepared in thin metal leaves, with a thickness less than 0.2 millimetres (8 mils), thinner gauges down to 6 µm (0.2 mils)...
|
Capacity : Aluminium Foil Food Grade (thickness 0.006 mm to 0.150 mm): 24 MT/Day |
Plant and Machinery cost: Rs 310 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 1252 lakhs |
|
Cost of Project : 125200000 |
Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...
|
Capacity : Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 586 lakhs |
|
Cost of Project : 58600000 |
Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total production surpassing that of wheat...
|
Capacity : Maize Starch : 60MT/Day Sorbitol : 30MT/Day Liquid Glucose: 30MT/Day Dextrose Monohydrate: 30MT/Day Dextrose Anhydrous: 15MT/Day Gluten |
Plant and Machinery cost: 6690 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs10721 lakhs |
|
Cost of Project : 1072100000 |
Gypsum board, also known as “drywall” or “plaster board,” consists of a core of gypsum surrounded with a paper covering. These gypsum board products i...
|
Capacity : Gypsum Plaster Board (Size 2440x1220x12 mm):10000 Sq.Mt./day |
Plant and Machinery cost: 549 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 3188 lakhs |
|
Cost of Project : 318800000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : 300000 Nos./day |
Plant and Machinery cost: 4684 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 10012 lakhs |
|
Cost of Project : 1001200000 |
Aluminium beverage cans are every day commodities that people come across on a regular basis, whether it’s while they are grocery shopping, taking the...
|
Capacity : 15,050,000 Pcs. /annum |
Plant and Machinery cost: 172 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 712 lakhs |
|
Cost of Project : 71200000 |
Lime is manufactured from lime stone. Lime is mainly used for manufacture of hydrated lime. Hydrated lime is a dry powder obtained by treating quick l...
|
Capacity : 600 MT/Day |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project 548 Lakhs |
|
Cost of Project : 54800000 |
Pectin is a structural heteropolysaccharide contained in the primary cell walls of terrestrial plants. It was first isolated and described in 1825 by...
|
Capacity : 150,000Kgs/annum |
Plant and Machinery cost: 1289 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project 1660 Lakhs |
|
Cost of Project : 166000000 |
An electric motor is a device converting electrical energy into mechanical energy (usually a torque). This conversion is usually obtained through the...
|
Capacity : 60,000 Nos/annum |
Plant and Machinery cost: 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 313 lakhs |
|
Cost of Project : 31300000 |