Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials ("man's first plastic") was discovered ver...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs 97 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.90 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs 343 Lakhs |
|
Cost of Project : 34300000 |
Petroleum jelly or petrolatum was discovered as a paraffin-like material coating oil rigs. Since then, it has been used in various ointments and as a...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The aluminium aerosol can has been one of the most popular packaging materials for cosmetics, pharmaceutical and household items for decades. In addit...
|
Capacity : Aerosol Cans (200 ml Size):72000 Nos./Day |
Plant and Machinery cost: Rs 182 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 55.46 |
TCI : Cost of Project:Rs 772 Lakhs |
|
Cost of Project : 77200000 |
Barley Malt is germinated cereal grains that have been dried in a process known as "malting". The grains are made to germinate by soaking in water, an...
|
Capacity : 100MT/Day |
Plant and Machinery cost: Rs 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 1672 Lakhs |
|
Cost of Project : 167200000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of choic...
|
Capacity : Copper Powder:3.33 MT/Day |
Plant and Machinery cost: Rs 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.33 |
|
Break Even Point (BEP): 63.22 |
TCI : Cost of Project:Rs 321 Lakhs |
|
Cost of Project : 32100000 |
Wheat is grown in most parts of the world, from near-arctic to near-equatorial latitudes. It is the most important crop among the cereals by area plan...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: Rs 385 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:Rs 904 Lakhs |
|
Cost of Project : 90400000 |
Huge amounts of used lubricating oils from automotive sources are disposed of as a harmful waste into the environment. The cost and availability of oi...
|
Capacity : Reclaimed Engine Oil :5000 Litres/Day |
Plant and Machinery cost: Rs 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project:Rs 161 Lakhs |
|
Cost of Project : 16100000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : Blended Lubricating Oil 4 KL/ Day •Greases:1 KL/Day |
Plant and Machinery cost: Rs 174 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 465 Lakhs |
|
Cost of Project : 46500000 |