Please choose a project below related to this category.
Copper wire is an essential material for electrical cables, motor and transformer winding. It is available in different gauges. The gauge of the copp...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 68 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 167 Lakhs |
|
Cost of Project : 0 |
The maize also called “Corn or Indian Corn is widely cultivated in India. Maize ranks high among the four or five principal cereal crops of the wor...
|
Capacity : 200 MT Maize Processing/ Day |
Plant and Machinery cost: 32 Crores |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 73 Crores |
|
Cost of Project : 0 |
The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above t...
|
Capacity : 24,000 MT /Year |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 716 Lakhs |
|
Cost of Project : 0 |
In the most general sense of the word, cement is a binder, a substance which sets and hardens independently, and can bind other materials together. Th...
|
Capacity : 4000 Bag / Day |
Plant and Machinery cost: 3 Crore |
|
Working Capital : - |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 10 Crore |
|
Cost of Project : 0 |
Copper is the perfect material for recycling. It is valuable, easy to identify, easy to clean, heavy and can be much use to foundries & other non-fer...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 279 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 684 Lakh |
|
Cost of Project : 0 |
Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...
|
Capacity : 135000 MT / Annum |
Plant and Machinery cost: 7175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 8923 Lakhs |
|
Cost of Project : 0 |
Coconut is a small holder’s plantation crop grown in the humid tropics and tropical regions. India is a major producer of coconut in the world. Vir...
|
Capacity : 600 MT / Day |
Plant and Machinery cost: 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 153 Lakh |
|
Cost of Project : 0 |
Fruit juices are health drinks; it is largely used throughout the society and popularity of fruit juices are gradually increasing. There is good scope...
|
Capacity : Mango Juice 3600 KLs., Orange Juice 3600 KLs,Litchi Juice 3600 KLs,Sugarcane Juice 720 KLs Per Annum |
Plant and Machinery cost: 275 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 726 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 66 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs. 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Rs. 13 crores |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Coconut oil, also known as coconut butter, is a tropical oil with many applications. It is extracted from copra (derived from Malayalam word "kopra" w...
|
Capacity : 10 Ton / Day |
Plant and Machinery cost: 33 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 358 Lakh |
|
Cost of Project : 0 |