Please choose a project below related to this category.
Today the food containers that are being used in our daily living extend over the widest range, from those which are raw material of new materials suc...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium is a metal with high strength-to weight ratio, better formability, high ductility, anti-corrosive properties with thermal and electrical con...
|
Capacity : 21600 MT/Year |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 2020 Lakhs |
|
Cost of Project : 202000000 |
Aluminium is second most plentiful metallic element on earth become an economic competitor in engineering applications. The aluminium industry growth...
|
Capacity : 144000 MT/Annum |
Plant and Machinery cost: 395 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 1147 Lakhs |
|
Cost of Project : 114700000 |
Hot rolling, also called hot working, is a metallurgical process of in which large pieces of metal such as slabs or billets are deformed between rolle...
|
Capacity : 10,00,000 MT / Annum |
Plant and Machinery cost: 79 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 197 Crores |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) is a term used to describe a variety of process combining controlled thermal and deformation treatment to obtain syn...
|
Capacity : 50,000 MT/Annum |
Plant and Machinery cost: 310 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 1189 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
The alcohol based chemical industry is worth around Rs. 5,000 crores in terms of total investment or (US$ 1.15 billion) and contributes Rs. 500 crores...
|
Capacity : 1000 Ltrs./Day |
Plant and Machinery cost: 17 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 150 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 1000 MT/Annum |
Plant and Machinery cost: Rs. 194 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 598 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 4 MT/Day |
Plant and Machinery cost: Rs. 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Ready mix concrete is a modern trend of introduction in the Asian countries. It is new concept of use concrete in the construction area. Ready mix has...
|
Capacity : 8000 No. Concrete Block / Day, 165 Cubic Meter Ready Mix Concrete / Day |
Plant and Machinery cost: 5 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 12 Crores |
|
Cost of Project : 0 |
The term activated carbon, active carbon or active charcoal is usually applied to amorphous carbons possessing higher absorption capacities than wood...
|
Capacity : 20 Ton / Day |
Plant and Machinery cost: 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 581 Lakhs |
|
Cost of Project : 0 |