Please choose a project below related to this category.
These are mineral oils and are used to dissipate the heat generated in electric transformers, switches, circuit breakers and motor starters etc. They...
|
Capacity : 100KLS/Day |
Plant and Machinery cost: 1104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 3031 Lakhs |
|
Cost of Project : 0 |
Bolts in various dimensions and head-shapes are available. Bolts can be supplied unfinished, semi-finished and fully finished conditions. U-bolts are...
|
Capacity : 5.00 MT./day |
Plant and Machinery cost: Rs. 152 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 436 lakhs |
|
Cost of Project : 0 |
Coconut is a small holders plantation crop grown in the humid tropics and tropical regions. India is a major producer of coconut in the world. The cou...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 56.00 |
TCI : 153 Lakhs |
|
Cost of Project : 0 |
Plastic floor tiles are known for some time Artificial synthetic marble the invention of the developing affordable resort, virtually replacing the use...
|
Capacity : 3.00 MT/day |
Plant and Machinery cost: Rs. 29 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 154 lakhs |
|
Cost of Project : 0 |
The asbestos sheet was first manufactured in 1914 in Japan. Since then improvement have been repeatedly made in the quality, shape and manufacturing p...
|
Capacity : 1000 NOS./day |
Plant and Machinery cost: Rs. 81 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 291 lakhs |
|
Cost of Project : 0 |
Contract farming is most commonly practiced by food processing firms. These firms have an interest in keeping raw material inflows at a stable level,...
|
Capacity : 75000 Nos. Bottle Fruit Juice/Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 2876 Lakhs |
|
Cost of Project : 0 |
Metals is general and steel particular can be worked into useful shapes by hammering or pressing. This method of metal working is known as forging. A...
|
Capacity : 90 MT/Day |
Plant and Machinery cost: 631 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 2926 Lakhs |
|
Cost of Project : 0 |
Steel shots and grits are used in both static and site blasting equipments. Materials and abrasives used for surface preparation can be hazardous if u...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: 203 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 858 Lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25% of the cost of a chemical process plant. The economics depends heavily on the pipe size and fabrication techniques...
|
Capacity : 300000 Nos./Day |
Plant and Machinery cost: 54 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 195 Lakhs |
|
Cost of Project : 0 |
A solvent is a liquid which disperses a solid or semi solid substance so as to yield a useful solution. Such a liquid is termed simply diluents. Thin...
|
Capacity : 1000 Ltrs./Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 61 Lakhs |
|
Cost of Project : 0 |
Date is one of the best fruits, which contains fructose as sugar ingredients, which is totally fermentable sugar and can be completely converted to et...
|
Capacity : 10000 Ltrs./Day |
Plant and Machinery cost: 815 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 1264 Lakhs |
|
Cost of Project : 0 |
There is large use of animal feed in India, Middle East and also in the European Countries. It will help to increase the animal health. Most of the ra...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 70 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 480 Lacs |
|
Cost of Project : 0 |