Please choose a project below related to this category.
Coconut is one of the important fruit having large uses starting from bakery, confectionery, pharmaceutical industries to beverage industry and many...
|
Capacity : 27534 MT/Annum |
Plant and Machinery cost: 440 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project 1750 Lakhs |
|
Cost of Project : 0 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : 682 Lakhs |
|
Cost of Project : 0 |
Charcoal and purity of any substances has now become a basic requirement of any chemical substance. So many products obtained by processing are dirty...
|
Capacity : 5 Tons/day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 107 Lakhs |
|
Cost of Project : 0 |
The importance of iron & steel among other materials is well known for industrialization and national economy. Metal fabrication is the group of enti...
|
Capacity : 2 MT/day |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 131 Lakhs (W/c. 2 month) |
|
Cost of Project : 0 |
Aluminium, the second most plentiful metallic element on earth, became an economic competitor in engineering applications as recently as the end of th...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 322 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 692 Lakhs |
|
Cost of Project : 0 |
Casting is the oldest form of metal shaping and is still the basic engineering process since most metals are melted and cast from ores. Casting are ma...
|
Capacity : 1200 MT/Annum |
Plant and Machinery cost: 132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project Rs. 262 Lakhs |
|
Cost of Project : 26200000 |
Piping may represent as much as 25 percent of the cost of a chemical-process plant. The installed cost of piping systems varies widely with the materi...
|
Capacity : 1500 MT / Annum Tubes, 600 MT/Annum Fittings |
Plant and Machinery cost: 554 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 752 Lakhs |
|
Cost of Project : 0 |
Engine oil becomes contaminated with foreign material in service. In circulating systems, where a substantial quantity of oil is involved, it is desir...
|
Capacity : 1 MT/day |
Plant and Machinery cost: Rs. 20 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 100 Lakhs |
|
Cost of Project : 0 |
A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivotal...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 352 lakhs |
|
Cost of Project : 0 |
Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 2396 lakhs |
|
Cost of Project : 0 |
Activated carbon in any form of carbon shows high absorptivity for gases, vapours and colloidal solids in either the gas ion or liquid phase. It is av...
|
Capacity : 3.00 Tone/day |
Plant and Machinery cost: Rs. 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Rs. 150 Lakhs |
|
Cost of Project : 0 |
The production of G.I. Wire from H.B. wire is not complicated. In case of H.B. wire drawing from H.B. bars, certain mechanical process is used. An imp...
|
Capacity : 8.00 MT./day |
Plant and Machinery cost: Rs. 70 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 419 lakhs |
|
Cost of Project : 0 |