Please choose a project below related to this category.
Inkpad or Stamp Pad is a small box which contains a pad of cloth or other material. It is impregnated with ink (the pad is inky). A marker is pressed...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Cheese analogues (more widely known as cheese alternatives) are products used as culinary replacements for cheese. These include vegan cheeses as well...
|
Capacity : 1000 Kgs./Day |
Plant and Machinery cost: 36 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 126 lakhs |
|
Cost of Project : 12600000 |
Hydropower is a renewable energy resource that utilizes Earth’s water cycle to generate electricity. The movement of water flow downstream in lakes an...
|
Capacity : 10 MW |
Plant and Machinery cost: 6100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project: 8014 Lakhs |
|
Cost of Project : 801400000 |
Silicon is the most abundant element in Earth's crust. It is found in rocks, sand, clays and soils, combined with either oxygen as silicon dioxide, or...
|
Capacity : Silicon Metal: 25 MT /Day |
Plant and Machinery cost: Rs 1277 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 2484 lakhs |
|
Cost of Project : 248400000 |
Phosphates play a vital role in the balanced nutrition of plants. Most of the soils in India are low to medium in phosphate (P) content which requires...
|
Capacity : Phosphate Rich Organic Manure (PROM): 1000000 MT /Annum |
Plant and Machinery cost: Plant & Machinery: Rs 290 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : Rs 4612 lakhs |
|
Cost of Project : 461200000 |
Ghee, also referred to as clarified butter, is a good alternative to cooking oil and is often used in Indian and Middle Eastern dishes. It is very fra...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Baker's yeast is the common name for the strains of yeast commonly used as a leavening agent in baking bread and bakery products, where it converts th...
|
Capacity : Baker |
Plant and Machinery cost: 522 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 1101 lakhs |
|
Cost of Project : 110100000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Medical College 500 Students &Hospital 750 Beded |
Plant and Machinery cost: 2047 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 10747 lakhs |
|
Cost of Project : 1074700000 |
The growth of the ultra high temperature (UHT) sterilization process of milk has been tremendous for the last two decades all over the world. The adva...
|
Capacity : Pasteurised Milk (1 Ltr Pouch):1000 Kgs/day Skimmed Milk (1 Ltr Pouch):3500 Kgs/dayPaneer:1000 Kgs/day Butter |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project: Rs 519 lakhs |
|
Cost of Project : 51900000 |
The importance of education was well recognized in India, ‘Swadeshepujyate raja, vidwansarvatrapujyate’ “A king is honoured only in his own country, b...
|
Capacity : KG to 12th Standard Students: 2000 Students/Annum |
Plant and Machinery cost: 63 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 13.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 1098 lakhs |
|
Cost of Project : 109800000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
Indian vegetable basket is incomplete without mentioning the king of vegetables-potato-a sustaining force and a culinary delight. Potato powder is inc...
|
Capacity : 1200 MT/annum |
Plant and Machinery cost: Rs 135 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 397 lakhs |
|
Cost of Project : 39700000 |