Please choose a project below related to this category.
Dish antenna, also known simply as a dish, is common in microwave systems. This type of antenna can be used for satellite communication and broadcast...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Fluorescent lamp, or fluorescent tube, is a low-pressure mercury-vapor gas-discharge lamp that uses fluorescence to produce visible light. An electric...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Leather footwear are premium products occupying a significant market share in the global market for footwear. Additionally, rising health concerns are...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Computer keyboard is one of the primary input devices used with a computer that looks similar to those found on electric typewriters, but with some ad...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Inkpad or Stamp Pad is a small box which contains a pad of cloth or other material. It is impregnated with ink (the pad is inky). A marker is pressed...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Cheese analogues (more widely known as cheese alternatives) are products used as culinary replacements for cheese. These include vegan cheeses as well...
|
Capacity : 1000 Kgs./Day |
Plant and Machinery cost: 36 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 126 lakhs |
|
Cost of Project : 12600000 |
Hydropower is a renewable energy resource that utilizes Earth’s water cycle to generate electricity. The movement of water flow downstream in lakes an...
|
Capacity : 10 MW |
Plant and Machinery cost: 6100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project: 8014 Lakhs |
|
Cost of Project : 801400000 |
Silicon is the most abundant element in Earth's crust. It is found in rocks, sand, clays and soils, combined with either oxygen as silicon dioxide, or...
|
Capacity : Silicon Metal: 25 MT /Day |
Plant and Machinery cost: Rs 1277 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 2484 lakhs |
|
Cost of Project : 248400000 |
Phosphates play a vital role in the balanced nutrition of plants. Most of the soils in India are low to medium in phosphate (P) content which requires...
|
Capacity : Phosphate Rich Organic Manure (PROM): 1000000 MT /Annum |
Plant and Machinery cost: Plant & Machinery: Rs 290 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : Rs 4612 lakhs |
|
Cost of Project : 461200000 |
Ghee, also referred to as clarified butter, is a good alternative to cooking oil and is often used in Indian and Middle Eastern dishes. It is very fra...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Baker's yeast is the common name for the strains of yeast commonly used as a leavening agent in baking bread and bakery products, where it converts th...
|
Capacity : Baker |
Plant and Machinery cost: 522 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 1101 lakhs |
|
Cost of Project : 110100000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Medical College 500 Students &Hospital 750 Beded |
Plant and Machinery cost: 2047 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 10747 lakhs |
|
Cost of Project : 1074700000 |