Solar Panels are in general Silicon made Rectangular Shaped Glass Covered Products which Produce Electricity when exposed to the Sun. These Panels pro...
|
Capacity : Solar PV Module (240 watt) : 350 Nos/day (25 MW) |
Plant and Machinery cost: Rs 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of project: Rs 852 Lakhs |
|
Cost of Project : 85200000 |
Beer is the world's oldest beverage, possibly dating back to the 6th millennium BC. It is also the most widely consumed alcoholic beverage and the thi...
|
Capacity : Beer (650 ml size Bottle):10,000 Litres/Day |
Plant and Machinery cost: Rs 306 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 1055 Lakhs |
|
Cost of Project : 105500000 |
Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials ("man's first plastic") was discovered ver...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs 97 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.90 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs 343 Lakhs |
|
Cost of Project : 34300000 |
Petroleum jelly or petrolatum was discovered as a paraffin-like material coating oil rigs. Since then, it has been used in various ointments and as a...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The sys...
|
Capacity : 10000 Nos./Day |
Plant and Machinery cost: Rs 176 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.24 |
|
Break Even Point (BEP): 69.15 |
TCI : Cost of Project:Rs 1106 Lakhs |
|
Cost of Project : 110600000 |
Polymer, that are cheaper and lighter than many materials, are being favored for industrial and commercial applications. Plastics are necessary in dai...
|
Capacity : Bio-Degradable Plastic Polymer 33.33 MT/Day |
Plant and Machinery cost: Rs 5547 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.13 |
|
Break Even Point (BEP): 42.83 |
TCI : Cost of Project : Rs 7170 Lakhs |
|
Cost of Project : 717000000 |
Enzymes are macromolecular biological catalysts. Enzymes accelerate, or catalyze, chemical reactions. The molecules at the beginning of the process ar...
|
Capacity : Alkaline Protease 1MT/Day •Amylase 1MT/Day •Cellulase 1MT/Day •Laccase 1MT/Day |
Plant and Machinery cost: Rs 5693 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.32 |
TCI : Cost of Project : Rs 14825 Lakhs |
|
Cost of Project : 1482500000 |
Renewable energy in India comes under the purview of the Ministry of New and Renewable Energy. India was the first country in the world to set up a mi...
|
Capacity : Solar Power 10 MW:60,000 KWH/ Day |
Plant and Machinery cost: Rs 5512 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 5.68 |
|
Break Even Point (BEP): 53.14 |
TCI : Cost of Project :Rs 8447 Lakhs |
|
Cost of Project : 844700000 |
Renewable energy in India comes under the purview of the Ministry of New and Renewable Energy. India was the first country in the world to set up a mi...
|
Capacity : Solar Power 10 MW: 60,000 KWH/ Day |
Plant and Machinery cost: Rs 5512 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 5.68 |
|
Break Even Point (BEP): 53.14 |
TCI : Cost of Project : Rs 8447 Lakhs |
|
Cost of Project : 844700000 |
Wheat is grown in most parts of the world, from near-arctic to near-equatorial latitudes. It is the most important crop among the cereals by area plan...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: Rs 385 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:Rs 904 Lakhs |
|
Cost of Project : 90400000 |
Huge amounts of used lubricating oils from automotive sources are disposed of as a harmful waste into the environment. The cost and availability of oi...
|
Capacity : Reclaimed Engine Oil :5000 Litres/Day |
Plant and Machinery cost: Rs 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project:Rs 161 Lakhs |
|
Cost of Project : 16100000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project :Rs 10747 Lakhs |
|
Cost of Project : 1074700000 |