Please choose a project below related to this category.
Guar Gum Powder is manufactured from Guar seed. Rajasthan is the major producer of Guar seed having almost 70% shares in production. This powder is in...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 0.01 |
|
Break Even Point (BEP): 0.01 |
TCI : - |
|
Cost of Project : 0 |
Precipitated silica (also called particulate silica) is compound of aggregates of ultimate particles of colloidal size that have not become linked in...
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 174 Lakhs |
|
Cost of Project : 0 |
Increase of inputs on tangible or non-tangible way in agriculture increased the production of crops. Soyabean, known as golden bean has emerged as the...
|
Capacity : 7.5 MT Soyabean Processing / Day (Cultivation in 1000 Hactares) |
Plant and Machinery cost: 1726 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 2686 Lakhs |
|
Cost of Project : 0 |
Activated carbon is a non graphite form of carbon and is microcrystalline in nature. It is extensively used in various industries as a very good absor...
|
Capacity : 5 Tons/Day |
Plant and Machinery cost: 67 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 51.00 |
TCI : 244 Lakhs |
|
Cost of Project : 0 |
Through bringing about a permanent union between the dyes and the yarn/fabric the yarns/textile are so colored that the colour is fast and is not ord...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 236 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 48.00 |
TCI : 518 Lakhs |
|
Cost of Project : 0 |
The production of poultry in the us and generally throughout the world is carried out by a highly specialized, efficient poultry industry that has be...
|
Capacity : 1 Lakhs Eggs/Day |
Plant and Machinery cost: 15 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 334 Lakhs |
|
Cost of Project : 0 |
Maize oil is produced as the big product from the maize. In wet milling industries starch and its product, corn syrup, dextrose, dextrin etc. Are the...
|
Capacity : 5 Mt/Day |
Plant and Machinery cost: 56 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 257 Lakhs |
|
Cost of Project : 0 |
Carbon is probably the most widely distributed element in nature. Activated carbon from rice husk has been developed & finding wider uses. There is c...
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 183 Lakhs |
|
Cost of Project : 0 |
Cotton has a pride of place among the commercial crops if India. Besides cotton, textile are manufactured by handlooms, power looms and composite mill...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : - |
|
Cost of Project : 0 |
Rabbit farming is increasing commercially in many countries. Rabbit farming on a small scale involves small number (a few dozen or less) of animals fe...
|
Capacity : 5000 Angora Rabbits Farming, 2 MT Rabbit Feed/Hr. & 100 kg Rabbit Yarn Wool/Day |
Plant and Machinery cost: 414 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 608 Lakhs |
|
Cost of Project : 0 |
Maize is one of the cereal grains which produce through out India and is placed 3rd position in agricultural base production though maize is not our s...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The maize also called “corn or Indian corn” is widely cultivated in India. Maize ranks high among the four or five principal cereal crops of the world...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |