Please choose a project below related to this category.
Maize is one of the most important cereal crops in the world agricultural economy and is grown in many countries in each of the continents of the worl...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. It contains the starch as a major carbohydrate. Surplus and cull potatoes are used as feed for l...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 86 Lakhs |
|
Cost of Project : 0 |
In view of the important of tomato either fresh or processed in the daily diet due to the high nutritive value, there are good potentials to develop t...
|
Capacity : 12 Ton/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 469 Lakhs |
|
Cost of Project : 0 |
Food is mainly composed of three main groups of constituents i.e., carbohydrates, Fat & Protein. The baby cereal food is that enriched food which has...
|
Capacity : 5.00 Tons/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 316 Lakhs |
|
Cost of Project : 0 |
Prestressed Concrete poles for electrical H.T. and L.T. lines widely used now a days in different power distribution in the villages specially rather...
|
Capacity : 30,000 Nos/Annum |
Plant and Machinery cost: 71 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : 209 Lacs |
|
Cost of Project : 0 |
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
A medical college is meant for important education of medical field to students to qualify them as doctors in different specialized disciplines so as...
|
Capacity : 100 Student/Annum & 500 Beds for Hospital |
Plant and Machinery cost: 1728 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 7957 Lakhs |
|
Cost of Project : 0 |
Extrusion is defined as a process in which material is pushed through an orifice or hole of given shape. The origin of the world comes from Latin (exm...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 222 Lakhs |
|
Cost of Project : 0 |
Prestressing is the process of applying a load to a structure deforming, so that it will withstand a work load more effectively or deflect less. Prest...
|
Capacity : 500 Nos./Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 514 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 500 MT/Day OR 10,000 BAGS/DAY |
Plant and Machinery cost: Rs. 476.00 Lakhs |
|
Working Capital : 606 Lacs |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 1307 Lacs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 500 MT/Day OR 10,000 BAGS/DAY |
Plant and Machinery cost: Rs. 476.00 Lakhs |
|
Working Capital : Rs. 606 Lacs |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 1307 Lacs |
|
Cost of Project : 0 |
Broken rice is the by-product of rice mill. It has various uses out of which one use is to prepare liquid glucose from broken rice. It can be processe...
|
Capacity : 30000MT/Annum |
Plant and Machinery cost: 664 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project 1107 Lacs |
|
Cost of Project : 0 |