Investment Opportunities & Business Ideas in Senegal, West Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Nursing Home
Nursing Home

Nursing homes are a type of residential care that provide around-the-clock nursing care for elderly people. Twenty-four-hour nursing care is available...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Mango Papad (Aam Papad)
Mango Papad (Aam Papad)

Aam papad is an Indian fruit leather made out of mango pulp mixed with concentrated sugar solution and sun dried. It is also known as Aamta (Assamese)...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Paper from Rice Husk & Wheat Husk
Paper from Rice Husk & Wheat Husk

Paper made from rice and wheat husk is widely used for manufacture of corrugated board. It is used for packing and wrapping and in the manufacture of...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Cold Water Soluble Starch
Cold Water Soluble Starch

Cold water starch is a modified starch used to stiffen textile and other related fabric. It is simply used in cold (room temperature) water or directl...

Capacity :

48 MT/Day

Plant and Machinery cost:

165 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

70.00

TCI :

Cost of Project: Rs 505 lakhs

Cost of Project :

505

Pre-Stressed Concrete Electric Poles
Pre-Stressed Concrete Electric Poles

PSC poles stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These p...

Capacity :

Pre-Stressed Concrete Electric Poles: 200 Nos./Day

Plant and Machinery cost:

158 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

58.00

TCI :

Cost of Project: Rs 462 lakhs

Cost of Project :

46200000

Fish and Prawn Feed
Fish and Prawn Feed

The production of fish meal from fish offal and surplus fish benefits both the national economy and the fisherman and should not be regarded as a salv...

Capacity :

Fish Feed: 30 MT/Day Prawn Feed: 30 MT/Day

Plant and Machinery cost:

84 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project : Rs 390 lakhs

Cost of Project :

39000000

Maize and It’s by Products Starch, Liquid Glucose, Dextrose, Sorbitol, Maltose, Gluten, Germ and Fiber)
Maize and It’s by Products Starch, Liquid Glucose, Dextrose, Sorbitol, Maltose, Gluten, Germ and Fiber)

Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total production surpassing that of wheat...

Capacity :

Maize Starch: 17520 MT /Annum Sorbitol: 3000 MT/Annum Liquid Glucose: 3000 MT/ Annum Dextrose Monohydrate: 3000 MT/ Annum Dextrose Anhydrous: 1500 MT/ Annum Gluten: 4590 MT/ Annum Maltodextrin: 1500 MT/ Annum Ge

Plant and Machinery cost:

4160 lakhs

Working Capital :

-

Rate of Return (ROR):

12.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 6928 lakhs

Cost of Project :

692800000

Dairy Farming
Dairy Farming

Dairy farming is a class of agriculture for long-term production of milk, which is processed for eventual sale of a dairy product. Dairying is an impo...

Capacity :

Cow Milk (Ltrs.): 756000 Units /Annum Manure (MT): 1080 Units /Annum Calf (Nos.): 126 Units /Annum

Plant and Machinery cost:

47 lakhs

Working Capital :

-

Rate of Return (ROR):

21.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project: Rs 529 lakhs

Cost of Project :

52900000

Water Based Acrylic Adhesive
Water Based Acrylic Adhesive

The term “adhesive” refers to a viscoelastic material which adheres instantaneously to most substrates with the application of slight pressure and rem...

Capacity :

2000 Kgs./Day

Plant and Machinery cost:

47 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project: Rs 251 lakhs

Cost of Project :

25100000

Wall Paper Starch
Wall Paper Starch

Starches are inherently unsuitable for most applications and, therefore, must be modi?ed chemically and/or physically to enhance their positive attrib...

Capacity :

Wall Paper Starch: 32 MT /Day

Plant and Machinery cost:

Rs 52 lakhs

Working Capital :

0

Rate of Return (ROR):

29.00

Break Even Point (BEP):

72.00

TCI :

Cost of Project: Rs 367 lakhs

Cost of Project :

36700000

Hexamethoxymethyl Melamine (HMMM)
Hexamethoxymethyl Melamine (HMMM)

Hexamethoxymethyl Melamine (HMMM) HMMM is a Hexa (methoxymethyl) melamine resin. It is used as a crosslinking agent with resorcinol or a novolak resin...

Capacity :

Hexamethoxymethyl Melamine (HMMM)6 M/Day

Plant and Machinery cost:

Rs 185 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: Rs 600 lakhs

Cost of Project :

60000000

Ready Mix Concrete with Concrete Blocks
Ready Mix Concrete with Concrete Blocks

Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...

Capacity :

Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day

Plant and Machinery cost:

Rs 83 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

69.00

TCI :

Cost of Project : Rs 586 lakhs

Cost of Project :

58600000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp