Please choose a project below related to this category.
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |
Guar is also called guaran, is a Galactomannan.It is primarily the ground endosperm of guar beans. The guar seeds are dehusked, milled and screened to...
|
Capacity : Guar Gum Powder: 6 MT/Day |
Plant and Machinery cost: 24600000 |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs 705 Lakhs |
|
Cost of Project : 70500000 |
Powdered milk is a dairy product produced from cow milk. Cow milk basically contains water, fats, protein sugar and ash. About 86% to 88% of cow milk...
|
Capacity : Skimmed Milk Powder 8.00 MT/Day • Whole Milk Powder 2.67 MT/Day • Dairy Whitener 1.50 MT/Day |
Plant and Machinery cost: Rs 387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 973 Lakhs |
|
Cost of Project : 97300000 |
Glucose is a monosaccharide (or simple sugar) also known as grape sugar, blood sugar, or corn sugar, is a very important carbohydrate in biology. The...
|
Capacity : Glucose 60 MT/Day,Sorbitol40 MT/Day, Maize Oil 12 MT/Day |
Plant and Machinery cost: Rs 5405 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 7732 Lakhs |
|
Cost of Project : 773200000 |
An adhesive is any substance applied to the surfaces of materials that binds them together and resists separation. The term "adhesive" may be used int...
|
Capacity : Contact Adhesive: 160 Kgs/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 220 Lakhs |
|
Cost of Project : 22000000 |
Maize and its By Products (Maize Starch, Modified Starches & Animal Feed) Corn starch, corn flour or maize starch is the starch derived from the c...
|
Capacity : Maize Starch : 37.50 MT/day•Modified Starch : 45 MT/day•Animal Feed:45 MT/day |
Plant and Machinery cost: Rs 1105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 2894 Lakhs |
|
Cost of Project : 289400000 |
The production of poultry throughout the world is carried out by a highly specialized, efficient poultry industry that has been a leader in trends of...
|
Capacity : Broilers : 400 Nos/Day,Eggs :600 Nos/Day |
Plant and Machinery cost: Rs 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs 103 Lakhs |
|
Cost of Project : 10300000 |
Poultry feed is needed to produce poultry, a substantial part of the food industry. Feeds are used as edible materials, which are consumed poultry and...
|
Capacity : 72000 MT/ Annum |
Plant and Machinery cost: Rs. 294 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1167 Lakhs |
|
Cost of Project : 116700000 |
Rice husk a major by-product of the rice milling industry, is one of the most commonly available lignocellulosic materials that can be converted to di...
|
Capacity : 6000 MT/ Annum |
Plant and Machinery cost: Rs. 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs. 374 Lakhs |
|
Cost of Project : 37400000 |
PSC stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These poles a...
|
Capacity : 60000 Nos. / Annum |
Plant and Machinery cost: Rs. 126 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 415 Lakhs |
|
Cost of Project : 41500000 |
In India the animal feed industry is of recent origin, the first animal food plant having been established in 1960. There are today as many as 14 plan...
|
Capacity : 15000 MT/ Annum |
Plant and Machinery cost: Rs. 160 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs. 405 Lakhs |
|
Cost of Project : 40500000 |