Please choose a project below related to this category.
Spinning is a major part of the textile industry. It is part of the textile manufacturing process where three types of fibre are converted into yarn,...
|
Capacity : 30s Combed Cotton Yarn:19.80 MT/Day •Cotton Waste Comber Noil:3.10 MT/Day •Cotton Waste Carding:1.91 MT/Day |
Plant and Machinery cost: Rs 7564 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.96 |
|
Break Even Point (BEP): 45.39 |
TCI : Cost of Project:Rs 10685 Lakhs |
|
Cost of Project : 1068500000 |
A hospital as a health care organization has been defined in varied terms as an institution involved in preventive, curative/ameliorative, palliative...
|
Capacity : 200 Beds |
Plant and Machinery cost: Rs 9607 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.71 |
|
Break Even Point (BEP): 36.08 |
TCI : Cost of Project:Rs 18371 Lakhs |
|
Cost of Project : 1837100000 |
Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of si...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: Rs 56 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.84 |
|
Break Even Point (BEP): 65.99 |
TCI : Cost of Project:Rs 360 Lakhs |
|
Cost of Project : 36000000 |
Camphor (Cinnamomum camphora) is a white, crystalline substance with a strong odor and pungent taste, derived from the wood of camphor laurel (Cinnamo...
|
Capacity : Camphor Powder: 2.5 MT/Day •Camphor Tablets:2.5 MT/Day |
Plant and Machinery cost: Rs 206 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.15 |
TCI : Cost of Project: Rs 547 Lakhs |
|
Cost of Project : 54700000 |
Biscuits are an important product in human diet and are usually eaten with tea and are also used as weaning food for infants.Around the world Biscuits...
|
Capacity : Biscuits:2.4 MT/Day •Candy :1.2 MT/Day |
Plant and Machinery cost: Rs 94 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.72 |
|
Break Even Point (BEP): 65.01 |
TCI : Cost of Project:Rs 297 Lakhs |
|
Cost of Project : 29700000 |
Camphor (Cinnamomum camphora) is a white, crystalline substance with a strong odor and pungent taste, derived from the wood of camphor laurel (Cinnamo...
|
Capacity : Camphor Powder: 2.5 MT/Day •Camphor Tablets:2.5 MT/Day |
Plant and Machinery cost: Rs 206 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.15 |
TCI : Cost of Project: Rs 547 Lakhs |
|
Cost of Project : 54700000 |
A handicraft, sometimes more precisely expressed as artisanal handicraft or handmade, is any of a wide variety of types of work where useful and decor...
|
Capacity : Woven Baskets :166 Pcs/Day•Mat & Mat Articles:83 Pcs/Day •Lamp Shades:266 Pcs/ Day •Cane Furnitures:50 Pcs/Day |
Plant and Machinery cost: Rs 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project: Rs 92 Lakhs |
|
Cost of Project : 9200000 |
Bamboo is a tribe of flowering perennial evergreen plants in the grass family Poaceae, subfamily Bambusoideae, tribe Bambuseae; although, the forestry...
|
Capacity : •Bamboo Sticks: 1280 Kgs/Day |
Plant and Machinery cost: Rs 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 82 Lakhs |
|
Cost of Project : 8200000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |