Please choose a project below related to this category.
The Indian healthcare dates back to the Vedic system of healthcare (Ayurveda) in 5000 BC. The Ayurvedic principles of positive health and therapeutic...
|
Capacity : 317 Patients/Day |
Plant and Machinery cost: Rs. 5280 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.77 |
|
Break Even Point (BEP): 34.95 |
TCI : Cost of Project: Rs. 7778 Lakhs |
|
Cost of Project : 777800000 |
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : 140 MT/Day |
Plant and Machinery cost: Rs. 358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 57.96 |
TCI : Cost of Project: Rs. 635 Lakhs |
|
Cost of Project : 63500000 |
Rice is an important food crop. It is consumed by more than half of the world’s population living in the developing countries. The demand of rice is i...
|
Capacity : 388 MT/Day |
Plant and Machinery cost: Rs. 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.02 |
|
Break Even Point (BEP): 47.16 |
TCI : Cost of Project: Rs. 1760 Lakhs |
|
Cost of Project : 176000000 |
Bagasse is the waste of sugar industry. It can be used for the production of bagasse base board or solid fuels or for the production of power or for t...
|
Capacity : 2000 Nos./Day |
Plant and Machinery cost: Rs. 637 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.59 |
|
Break Even Point (BEP): 53.25 |
TCI : Cost of Project: Rs. 1098 Lakhs |
|
Cost of Project : 109800000 |
Floral foam was mistakenly invented by a chemist named Vernon Smithers in the early 1940's. He created floral foam from synthetic substances or resins...
|
Capacity : 500 Kgs/Day. |
Plant and Machinery cost: Rs.73 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project:286 Lakhs. |
|
Cost of Project : 28600000 |
Rice flakes are tasty flakes that are created using rice grains. The process for creating rice flakes involves parboiling the rice, then flattening th...
|
Capacity : 10 MT/Day. |
Plant and Machinery cost: 52 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project :214Lakhs. |
|
Cost of Project : 21400000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |
Fevicol type adhesives come under the category of synthetic resins and latex adhesives are made from polyvinyl acetate is a thermoplastic, odourless,...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: Rs. 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost Of Project : Rs.82 Lakhs |
|
Cost of Project : 8200000 |
Adhesives are designed for specific applications, leading to thousands of products. Understanding how an adhesive works is difficult since adhesive p...
|
Capacity : Lamination Adhesives: 1 MT/Day, Bottle Labeling Adhesives: 1 MT/Day, Wood Adhesives: 1MT/Day |
Plant and Machinery cost: Rs.37 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost Of Project : Rs.232 Lakhs |
|
Cost of Project : 23200000 |
Wood plastic composite is good to solve the problem arises in the environment as there is scope of use of agricultural waste product to make WPC. One...
|
Capacity : 3840 Kgs./Day |
Plant and Machinery cost: Rs.75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost Of Project : Rs.289 Lakhs |
|
Cost of Project : 28900000 |
Infant cereals are an important energy source for the nutrition of infants in Mediterranean countries and form the basis of their weaning feeding from...
|
Capacity : - |
Plant and Machinery cost: Rs.472 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs.1751 Lakhs |
|
Cost of Project : 175100000 |
Cellular light weight concrete is also known as CLC, foamed cement, and light weight cement, world over thanks to its advantages over ordinary buildin...
|
Capacity : 50 Cu Mtr/Day |
Plant and Machinery cost: Rs.127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 16.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs.413 Lakhs |
|
Cost of Project : 41300000 |