Please choose a project below related to this category.
Bagasse is the waste of sugar industry. It can be used for the production of bagasse base board or solid fuels or for the production of power or for t...
|
Capacity : 2000 Nos./Day |
Plant and Machinery cost: Rs. 637 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.59 |
|
Break Even Point (BEP): 53.25 |
TCI : Cost of Project: Rs. 1098 Lakhs |
|
Cost of Project : 109800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 14400 MT/annum |
Plant and Machinery cost: Rs. 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.01 |
|
Break Even Point (BEP): 66.03 |
TCI : Cost of Project: Rs. 203 Lakhs |
|
Cost of Project : 20300000 |
Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The Starch industry in I...
|
Capacity : 78300 MT /Annum |
Plant and Machinery cost: Rs.5340 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project:Rs. 6916 Lakhs |
|
Cost of Project : 691600000 |
Indian poultry sector has been growing at around 8-10% annually over the last decade with broiler meat volumes growing at more than 10% while table eg...
|
Capacity : 250000 Birds per Annum |
Plant and Machinery cost: Rs.1145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs.1784 Lakhs |
|
Cost of Project : 178400000 |
The demand for food of animal origin is increasing in India due to economic growth, population growth and urbanization, which in turn means greater us...
|
Capacity : 30,000 MT/Annum |
Plant and Machinery cost: Rs. 222 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1070 Lakhs |
|
Cost of Project : 107000000 |
The epoxy resins have steadily grown in their use in the plastics and related industries due to the variety of forms in which they may be processed. E...
|
Capacity : 300 MT/Annum |
Plant and Machinery cost: Rs. 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs 97 Lakhs |
|
Cost of Project : 9700000 |
India is an agricultural country and livestock sector is an integral part of agriculture. Dairy farming from being traditional family run businesses t...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Karnataka, AP,...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
PETG resins are thermoplastic polyester engineering resins .PETG is sort of plastic without nitrogen, sulphur and halogen components and wit...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : -- |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The seed of Modern Epichlorohydrin (ECH)-Diphenyl-Propane (DPP) based epoxy resins was first shown by Castan, a Swiss chemist. His patents were licens...
|
Capacity : 300 MT/Annum |
Plant and Machinery cost: Rs. 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs 97 Lakhs |
|
Cost of Project : 9700000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Maize is consti...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |