Please choose a project below related to this category.
Starch (C6H10O5)n, the principal reserve poly Saccharide in plants constitutes substantial portion of human diet. It is the principal components of mo...
|
Capacity : 80 MT/day |
Plant and Machinery cost: Rs.358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.737 Lakhs |
|
Cost of Project : 73700000 |
Sugar cane is a C4 plant with a high rate of photosynthesis (its rate lies around 150 to 200% above the average for other plants). It is a perennial c...
|
Capacity : 45000 Ltrs/day |
Plant and Machinery cost: Rs.168 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs.2320 Lakhs |
|
Cost of Project : 0 |
Products, such as tomato paste/puree have potential demand with local fruit/vegetable processors as well as the retail market. Establishment of tomato...
|
Capacity : 75000 Pouches/Day (70 gms, 100 gms & 200 gms) |
Plant and Machinery cost: Rs.26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.599 Lakhs |
|
Cost of Project : 0 |
Milk is the normal product of mammary gland secretion. Milk is a complex, nutritious product that contains more than 100 substances that are either in...
|
Capacity : - |
Plant and Machinery cost: Rs 696 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 70.00 |
|
Break Even Point (BEP): 23.00 |
TCI : Rs 5708 Lakhs |
|
Cost of Project : 0 |
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
Particle board is a classic wood based panel, made from high quality particles of wood / bagasse. It is a low – density board with density range from...
|
Capacity : 500 Nos. / Day |
Plant and Machinery cost: Rs. 536 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs. 967 Lakhs |
|
Cost of Project : 96700000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of si...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 1008 Lakhs |
|
Cost of Project : 0 |
Wood plastic composite products is a new type composite material booming in recent years, refers to the use of polyethylene, polypropylene and polyvi...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 382 Lakhs |
|
Cost of Project : 38200000 |
Milk is an important human food. It is palatable, easy to digest and highly nutritive. It contains proteins, fat, sugar, minerals and a liberal quant...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 213 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 3172 Lakhs |
|
Cost of Project : 0 |
Water seepage is a major problem in construction industries particularly when the buildings are constructed in the damped environment. A large number...
|
Capacity : 3000 Liters /day |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 419 Lakhs |
|
Cost of Project : 0 |