Please choose a project below related to this category.
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica:10MT/Day •CaCO3 (by product):20.6MT/Day |
Plant and Machinery cost: Rs 864 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1255 Lakhs |
|
Cost of Project : 125500000 |
The cashew tree (Anacardium occidentale) is a tropical evergreen tree that produces the cashew nut and the cashew apple. It can grow as high as 14 met...
|
Capacity : Cashew Nuts: 600 Kgs/Day, Cashew Nut Shell by product: 1650 Kgs/Day |
Plant and Machinery cost: Rs 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.45 |
|
Break Even Point (BEP): 56.36 |
TCI : Cost of Project: Rs 126 Lakhs |
|
Cost of Project : 12600000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
‘‘Cotton’ the white gold is one of the most important commercial; crops playing a key role in the economical, political and social affairs of the cou...
|
Capacity : Cotton Yarn: 24 MT/Day |
Plant and Machinery cost: Rs 4112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 5426 Lakhs |
|
Cost of Project : 542600000 |
In modern tobacco farming, Nicotiana seeds are scattered onto the surface of the soil, as their germination is activated by light, then covered in col...
|
Capacity : Processed Tobacco Leaves: 24 MT/Day |
Plant and Machinery cost: Rs 1265 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 80.00 |
TCI : Cost of Project: Rs 2267 Lakhs |
|
Cost of Project : 226700000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |