Please choose a project below related to this category.
Potato is widely used vegetable in all over the world as food item. Modern food technologist has developed variety of food products which is manufactu...
|
Capacity : 1.0 Ton/Day |
Plant and Machinery cost: Rs. 67 Lacs |
|
Working Capital : Rs. 29 Lacs |
Rate of Return (ROR): 31.86 |
|
Break Even Point (BEP): 44.32 |
TCI : Rs. 163 Lacs |
|
Cost of Project : 0 |
The importance of potato as food is immense as it can be consumed in varied forms. Potato powder is a highly concentrated and nutritious flour ground...
|
Capacity : 6 Ton/Day |
Plant and Machinery cost: Rs. 175 Lakhs |
|
Working Capital : Rs. 176 Lakhs |
Rate of Return (ROR): 48.98 |
|
Break Even Point (BEP): 50.23 |
TCI : Rs. 460 Lakhs |
|
Cost of Project : 0 |
The banana plant is the most cultivated plant in the tropical countries. It is used as dessert, as vegetable and the fruit pulp is dried and processed...
|
Capacity : 40 MT/Day |
Plant and Machinery cost: Rs. 1329.00 Lakhs |
|
Working Capital : Rs. 218 Lakhs |
Rate of Return (ROR): 32.53 |
|
Break Even Point (BEP): 52.53 |
TCI : Rs. 1792 Lakhs |
|
Cost of Project : 0 |
Dried and fried cashewnut possess pleasant taste and flavour. They are mostly eaten fried, and are sometimes salted or sugared. They are used in large...
|
Capacity : 1 MT/ Day |
Plant and Machinery cost: Rs. 13 Lakhs |
|
Working Capital : Rs. 26 Lakhs |
Rate of Return (ROR): 58.43 |
|
Break Even Point (BEP): 29.78 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
The phrase "Potato Powder" could represent a number of things, but one of that could be a business opportunity for startups and first-time e...
|
Capacity : 10 MT Per Day |
Plant and Machinery cost: 371 |
|
Working Capital : N/A |
Rate of Return (ROR): 29% |
|
Break Even Point (BEP): 44% |
TCI :
|
|
Cost of Project : 1318 |
Banana can be preserved for 3 months or more by reducing the moisture in it by drying or frying. In India, food is preserved by sun-drying, mostly fru...
|
Capacity : 100 Kgs/Day |
Plant and Machinery cost: Rs. 3 Lakhs |
|
Working Capital : Rs. 10 Lakhs |
Rate of Return (ROR): 44.53 |
|
Break Even Point (BEP): 47.77 |
TCI : Rs. 18 Lakhs |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. Potato chips are basically used for snacks purposes. They are produced by rapid dehydration of p...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: Rs. 137 Lakhs |
|
Working Capital : Rs. 91 Lakhs |
Rate of Return (ROR): 39.21 |
|
Break Even Point (BEP): 40.17 |
TCI : Rs. 271 Lakhs |
|
Cost of Project : 0 |
In the brackish water of coastal areas the Prawns and shrimps grow naturally. In the prawn/Shrimp farming the body prawns & shrimp are grown in contro...
|
Capacity : 1200 Tons/Annum (Land & Building cost 460 Lacs) |
Plant and Machinery cost: Rs. 50 Lacs |
|
Working Capital : Rs. 61 Lacs |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs. 609 Lacs |
|
Cost of Project : 0 |
Aquaculture technology of sweet water fish farming is a good project for new entrepreneur and to meet up the demand growth of fish utilization.
|
Capacity : 1000 MT Fish/Annum |
Plant and Machinery cost: Rs. 150 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Rs. 200 Lacs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: Rs. 8 Lakhs |
|
Working Capital : Rs. 134 Lakhs |
Rate of Return (ROR): 51.74 |
|
Break Even Point (BEP): 40.21 |
TCI : Rs. 160.00 Lakhs |
|
Cost of Project : 0 |
Cement is a very important building material. It is used in almost all the constructions and is subjected to water in contact. If the concrete or ceme...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 39.28 |
|
Break Even Point (BEP): 48.99 |
TCI : - |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : 134 Lakhs |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |